Homepage|Business Center|Save the Page|Get the App
普通会员

ALLWIN ARCHITECTURAL HARDWARE INC.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Stainless Steel Sanitary Fittings Pipe 45 degree clamp Elbow
Stainless Steel Sanitary Fittings Pipe 45 degree clamp Elbow
Click on the image to view the original image
Product: views:4Stainless Steel Sanitary Fittings Pipe 45 degree clamp Elbow 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-24 01:07
  Negotiated
Product Details

Stainless Steel Sanitary Fittings Pipe 45 degree clamp  Elbow

 

Product Description

 

Stainless Steel Sanitary Fittings Pipe 45 degree clamp  Elbow

 

Stainless Steel Sanitary Fittings Pipe 45 degree clamp  Elbow

 

Item nr.

STAF100

 Size

  

 Material

304 / 316 Stainless Steel

 Finish

brushed / polished

Product Photos

 

Packaging & Shipping

 

Company Information

 

 

Procedure Video

 

 

 

Contact Information

ALLWIN Contact Information

Contact Person

Robert Wang

E-mail

Allwin(at)hibox.hinet.net

Telephone

+886 4 2293 0000

Fax

+886 4 2293 0707

Website

www.allwinhardware.com

 

 

How We Commitment To Quality

ALLWIN commitment to quality” is one of the values in ALLWIN culture.

To ensure the quality consistent, ALLWINinspect and well-control each procedure throughout the mass-production.

1. To ensure the material component follows the ASTM standard, ALLWIN use spectrometer to check the raw material before production. Before casting, we check the stainless steel element. After die-cast out, we check aging the casting. We also use spectrometer to check the solid bar before we start to machining it.

We also do the hardness testing for the product if necessary.

2. ALLWINuse measuring tools to check the product in each procedure throughout the mass-production to ensure the dimension of product meet customer’s requirement.

3. ALLWIN arrange Quality control department in each step of the mass-production to ensure each production fulfill their duty to produce well-product.

4. ALLWIN use salt spray testing machine to test the product, to ensure it meet specific corrosion-resistance requirement.

5. ALLWIN use 2D and 3D drawing to communicate with customer, which is clearly and accurately.
we also have a 3D printer which helps us to develop new item and also prints sample for customer approval.

Base on above five quality control steps, ALLWIN proudly says that ALLWIN commitment to quality

询价单
total0items  Comments