Overview
Quick Details
- Type:
- Aviation Obstruction Lights
- Input Voltage(V):
- 12VDC
- Lamp Power(W):
- 10
- Beam Angle(°):
- 360 Horizontal Beam Angle
- IP Rating:
- IP65
- Certification:
- CE, RoHS
- Emitting Color:
- Red
- Lamp Body Material:
- Stainless Steel
- Light Source:
- LED
- Place of Origin:
- Hunan, China
- Brand Name:
- CDT
- Model Number:
- CM012TR
- Vertical beam angle:
- ≥3°
- Light Intensity:
- 2000cd
- Flashing frequency:
- 20-60 times/min
- Lampshade:
- PC
- LED lifespan:
- 100,000 hours
- Net weight:
- 9kg
- Synchronization:
- GPS or control cabinet
Supply Ability
- Supply Ability:
- 10000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details
- Package suit for express or sea transportation,
carton with foam fulfilled in to keep aviation obstruction light from impact or other damage
- Port
- shenzhen
- Lead Time:
- within 15 days
Product Description
Name | Medium intensity type B high utility solar aviation obstruction light for wind generator |
Model | CM-012TR |
Input voltage | DC12V |
Power | ≤10W |
Flashing frequency | 20~60times/min |
Light intensity | 2,000cd(±25%) |
Light source | LED |
Light source lifespan | >100,000 hours |
Emitting color | Red |
Beam angle | 360°horizontal beam angle, ≥3° vertical beam spread |
Ingress protection | IP54 |
Lightning protection | 10KA |
Light controlled sensitivity | 100Lux |
Operating temperature | -55℃-55℃ |
Wind load | 60m/sec |
Net weight | 9kg |
Detailed Images
Applications
CM-012TR Medium intensity type B high utility solar aviation obstruction light for wind generator is usually used for electric power tower, wind power plant, and 45m-150m height buildings.
Certifications
Our Company
FAQ
1. Are you manufacturer or trading company?
We are professional manufacturer. Our company is located at #4 Xincheng S&T park, No.588 west of Yuelu road, Yuelu District, Changsha, Hunan, China. There are 23 kinds of aviation obstruction lights products and 9 kinds of helipad lighting products.
2. How"s delivery time?
stock products: 1-3 days
produce when materials are ready: 5-7 days
produce when materials need to purchase: 7-15 days
3. What about MOQ?
You are welcome to purchase from us for MOQ at 1 piece, we value each and every customer.
Contact