Overview
Quick Details
- Type:
- Aviation Obstruction Lights
- Input Voltage(V):
- AC220V
- Lamp Power(W):
- 15
- Beam Angle(°):
- 360° horizontal
- IP Rating:
- IP65
- Certification:
- CE, RoHS
- Emitting Color:
- White
- Lamp Body Material:
- Aluminum Alloy
- Light Source:
- LED
- Place of Origin:
- Hunan, China
- Brand Name:
- CDT
- Model Number:
- CM-13-A/B
- Emitting color:
- White/Red
- Power:
- 40W(dat), 15W(night)
- Lampshade:
- PC
- Vertical beam angle:
- ≥3°
- Light Intensity:
- 2000-20000cd
- LED lifespan:
- 100,000 hours
- Net weight:
- 7kg
Supply Ability
- Supply Ability:
- 10000 Piece/Pieces per Month
Packaging & Delivery
- Packaging Details
- Package suit for express or sea transportation,
carton with foam fulfilled in to keep aviation obstruction light from impact or other damage
- Port
- shenzhen
- Lead Time:
- within 15 days
Product Description
Name | ICAO medium intensity type A/B dual light 100000 hours lifetime led aircraft warning lights |
Model | CK-13-A/B |
Input voltage | AC 220V, others can be customized |
Power | ≤40W(day); ≤15W(night) |
Flashing frequency | 20-60 times/min |
Light intensity | 2000 cd-20000 cd |
Light source | LED |
Light source lifespan | > 100,000 hours |
Emitting color | White (day), Red (night) |
Beam angle | 360° horizontal,≥3° vertical |
Ingress protection | IP65 |
Lightning protection | 15KA |
Light controlled sensitivity | 50Lux |
Operating temperature | -55℃-55℃ |
Wind load | 80 m/sec |
Net weight | 7kg |
Detailed Images
Applications
CK-13 ICAO medium intensity type A/B dual light 100000 hours lifetime led aircraft warning lights is specially used for 45m-150m height buildings.
Certifications
Our Company
FAQ
1. Are you manufacturer or trading company?
We are professional manufacturer. Our company is located at #4 Xincheng S&T park, No.588 west of Yuelu road, Yuelu District, Changsha, Hunan, China. There are 23 kinds of aviation obstruction lights products and 9 kinds of helipad lighting products.
2. How"s delivery time?
stock products: 1-3 days
produce when materials are ready: 5-7 days
produce when materials need to purchase: 7-15 days
3. What about MOQ?
You are welcome to purchase from us for MOQ at 1 piece, we value each and every customer.
Contact