Homepage|Business Center|Save the Page|Get the App
普通会员

Zhongshan Celux Lighting & Electronics Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Zhongshan 6W+3W blue color led panel
Zhongshan 6W+3W blue color led panel
Click on the image to view the original image
Product: views:2Zhongshan 6W+3W blue color led panel 
Branch: CELUX
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 15:41
  Negotiated
Product Details
Overview
Quick Details
Input Voltage(V):
AC85-265V
Lamp Luminous Flux(lm):
900
CRI (Ra>):
80
Working Temperature(℃):
-20 - +40
Working Lifetime(Hour):
30000
Lamp Body Material:
Aluminum
IP Rating:
IP40
Certification:
CE, CQC, EMC, LVD, RoHS
Place of Origin:
Guangdong, China
Brand Name:
CELUX
Model Number:
CET-130SS
Light Source:
LED
Product Name:
Zhongshan guzhen lighting factory 6W+3W led panel blue color led panel
Beam angle:
120 Degree
Size:
145X145mm
Cover:
PC/PMMA
Power Factor:
0.65~0.97
Application:
Office,Home,Hotel,Store, any other indoor occations
Item Type:
Panel Lights
LED Light Source:
Epistar
Warranty(Years):
3
Lamp Power(W):
9
Lamp Luminous Efficiency(lm/w):
100
Color Temperature(CCT):
2700-6500K
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
each one with inner box, 20pcs in one carton
Port
Huangpu
Lead Time:
Shipped in 15 days after payment
Product Description

 

 

 

Zhongshan guzhen lighting factory 6W+3W led panel blue color led panel 

Product Features:

*Wattage: 6W+3W

*Chip: Epistar

*Voltage: AC 85-265V 50/60HZ

*Lumen: 900lm

 

 

*Material: Aluminum

*Color Temperature: 2700-6500k

*Power Factor: >0.95  

*CRI: 80

*Warranty: 3 years

*Product Size: 145X145mm

 

Packaging Details:

CARTON

Carton Dimensions: 48.5*45.5*25.5cm

Quantity/Carton: 20pcs 

Quantity of 20GP/40GP/40HQ:

10000/20000/24000pcs  

Certificates:

IS09001:2000/CE/CB/RoHS/LVD/ERP reports

Logistics Ability:

Arrange the Mixed logistical for Election delivery as By Air and By Sea. over 10 years’ experience for logistical arrange

Delivery Time:

Material Preparation Time 10 days

Assembly & Packaging Time: 15 days

Total Delivery Time 25 days in 50,000PCS for safe delivery

lead time

The faster delivery could be negotiable 

Factory Scale:

Total Area of 5000 square meters (538193
square feet)

Production Staff 100 to 200

QC Staff: 10 to 20

R&D Staff: 6 to 10

Application

Exhibition, Hospital; Hotel; Office; Library; Super market; indoor lighting

 

 

Power

 

 

 

Color

 

Company Information

 

Production Process

 

Contact Us

 

 

询价单
total0items  Comments