- Product Name:
- CET-8407 Connector Box
- Key Words:
- terminalblock box
- Material:
- Plastic
- Usage:
- Electric Power Cable
- Application:
- Fixing Power Cable
- Packing:
- Standard Package
- Certification:
- ISO9001:2008
- Color:
- Blue
- Type:
- Power Distribution
- Supply Ability:
- 100000 Piece/Pieces per Month CET-8407 Connector Box Electric Power Cable terminalblock box
- Packaging Details
- 100 pieces per carton
- Port
- Ningbo
- Lead Time:
- 15 days
CET-8407 Connector Box Electric Power Cable terminal block box
Connection with or without ferrules.
Supplied with isulated back plate and transparent protective front cover.Self-extinguishing 960 mounting methods.
Fix on Din-rail; On plate with 2 screws.
When installing under a front plate,a blanking plate can be clipped onto the front plate insulation protective earth bar.
Each bar can be labelled using cab 3TM.
Conform to standard EN60947-1.
ICC:20KA peak.
Item No. | Bus Bar Spec. | No. of Bus Bar | Conductors with starfix temules X-Section (mm2) | Cond. wout ferr. X-Section(mm2) | Dimensions(L*W*H)mm |
CET8207 | 5*φ5.5mm | 2 | 1.5 to 6 | 2.5 to 6 | 65*42*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
CET8211 | 7*φ5.5mm | 2 | 1.5 to 6 | 2.5 to 6 | 100*42*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
2*φ9.0mm | 10 to 16 | 10 to 35 | |||
CET8215 | 11*φ5.5mm | 2 | 1.5 to 6 | 2.5 to 6 | 135*42*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
2*φ9.0mm | 10 to 16 | 10 to 35 | |||
CET8404 | 4*φ5.5mm | 4 | 1.5 to 6 | 2.5 to 6 | 43*85*50 |
CET8407 | 5*φ5.5mm | 4 | 1.5 to 6 | 2.5 to 6 | 65*85*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
CET8411 | 7*φ5.5mm | 4 | 1.5 to 6 | 2.5 to 6 | 100*85*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
2*φ9.0mm | 10 to 16 | 10 to 35 | |||
CET8415 | 11*φ5.5mm | 4 | 1.5 to 6 | 2.5 to 6 | 135*85*50 |
2*φ7.5mm | 6 to 16 | 10 to 25 | |||
2*φ9.0mm | 10 to 16 | 10 to 35 |
Q1: Can I have a sample for testing?
A: Yes, we can offer free sample, but you should afford the shipping cost.
Q2: Can I add my logo on the products?
A: Yes, OEM and ODM are available for us.
Q3: How can I get the after-service?
A: We will send you the free spare parts if the problems caused by us. If the products cannot be repaired,
we will send you new free quantity together with next order.
Q4: Do you have inspection procedures for products?
A: Our products100% self-inspection and testing before packing.
Q5: Can I have a visit to your factory before the order?
A: Sure, welcome to visit our factory.
Here is our factory address: Yueqing City, Liushi Town, Xinguang Industrial, Zhejiang Province.
Our factory is near Wenzhou airport, and we can pick you up in the airport, Hotel booking service is available.
Q6: How about delivery time of the order?
A: 15-20 days after getting deposit.
Q7: How about payment terms?
A: 20%-30% deposit, the rest payment balance against B/L. If have regular order and good order quantity,
we can give delay payment.