- Item Type:
- Ceiling Lights
- Light Source:
- LED
- Install Style:
- Downlights
- Input Voltage(V):
- AC85-265V
- Lamp Luminous Flux(lm):
- 1500
- CRI (Ra>):
- 80
- Working Temperature(℃):
- -25 - 40
- Working Lifetime(Hour):
- 500000
- Lamp Body Material:
- AL+LN
- IP Rating:
- IP40
- Certification:
- CE, EMC, RoHS, UL
- Place of Origin:
- Shanghai, China
- Brand Name:
- SHCET
- Model Number:
- CET-071-15W
- Product name:
- CET-071-15W
- power:
- 15W
- voltage:
- AC85-265V
- Power Factor:
- PF>0.95
- Installation:
- Reccessed
- Application:
- exhibition hall, museums, malls, office, bars, hotels, indoor lighting
- Warranty:
- 3years
- Lamp Power(W):
- 15
- LED Light Source:
- led
- Lamp Luminous Efficiency(lm/w):
- 100
- Color Temperature(CCT):
- 2700-6500K
- Supply Ability:
- 500000 Unit/Units per Month
- Packaging Details
- 1pcs/per box, standard export carton
Carton Dimensions: 39.5*39.5*59.5 cm
Quantity/Carton: 20pcs
Cbm/Ct:0.093
N.W/ctn:15
G.W/ctn:16
- Port
- Shanghai or Ningbo
- Lead Time:
- 20 Days After Getting Deposit
HOT 2016 CE CB ROHS CET-071 15W led ceiling light panel
Product Features: * Wattage: 15w * Chip: Epistar * Voltage: AC 85-265V 50/60Hz * Lumen: 1500lm * Installtion: Recessed by springs |
* Material: Aluminum |
| |
Certificates:
| Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years’ experience for logistical arrange. |
Delivery Time: Material Preparation Time: 10 days Assembly & Packaging Time: 15 days Total Delivery Time: 25 days in 50,000pcs for safe delivery lead time. The faster delivery could be negotiable. | Factory Scale: Total Area of: 5000 square meters (538193 square feet) Production Staff: 100 to 200 QC Staff: 10 to 20 R&D Staff: 6 to 10 |
Application: Meeting room, Exhibition, Hospital; Hotel; Office; Library; Super market; indoor lighting |
Q1: Can I have a sample for testing?
A:Yes, we can offer free sample, but you should afford the shipping cost.
Q2: Can I add my logo on the products?
A:Yes, OEM and ODM are available for us.
Q3: How can I get the after-service?
A: We will send you the free spare parts if the problems caused by us. If the products can not be repaired, we will send you new free quantity together with next order.
Q4: Do you have inspection procedures for products?
A: our products100% self-inspection and testing before packing.
Q5: Can I have a visit to your factory before the order?
A:Sure,welcome to visit our factory.
Here is our factory address: #7 Tongyi Industrial Area, Zhongshan City, Guzhen
Our factory is near Guangzhou airport, and we can pick you up in the airport, Hotel booking service is available.
Q6: How about delivery time of the order?
A: 15-20 days after getting deposit.
Q7: How about payment terms?
A: 20%-30% deposit, the rest payment balance against B/L. If have regular order and good order quantity, we can give delay payment.