Homepage|Business Center|Save the Page|Get the App
普通会员

Shanghai CET Electric Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb
CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb
Click on the image to view the original image
Product: views:2CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb 
Branch: SHCET
Type: g45
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 18:16
  Negotiated
Product Details
Overview
Quick Details
Type:
g45
Input Voltage(V):
AC85-265V
Lamp Luminous Flux(lm):
300
CRI (Ra>):
80
Working Temperature(℃):
-20 - +40
Working Lifetime(Hour):
30000
Lamp Body Material:
Glass
Certification:
CE, EMC, LVD, RoHS
Base Type:
E27
Place of Origin:
Guangdong, China
Brand Name:
SHCET
Model Number:
CET-G45
Light Source:
LED
Product:
3 w led bulb
Beam angle:
120 Degree
Lamp size:
45*45*72mm
Driver:
Isolated
Power factor:
0.95
Cover:
PC+ALUMINUM
IP Grade:
IP44
Warranty:
3years
Quality standerd:
ISO 9001
Application:
Home, meeting room, hotel, shopping mall, library, indoor lighting
Item Type:
Bulb Lights
Lamp Power(W):
3
LED Light Source:
SMD
Lamp Luminous Efficiency(lm/w):
100
Color Temperature(CCT):
2700K-6500K
Supply Ability
Supply Ability:
200000 Unit/Units per Month for CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb
Packaging & Delivery
Packaging Details
CARTON
Carton Dimensions: 34*34*31 cm
Quantity/Carton: 25pcs
Quantity of 20GP/40GP/40HQ:
18850/40450/47450pcs
For CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb
Port
Guangzhou
Lead Time:
Shipped in 20 days after payment

 

CE CB ROHS 3 w led bulb CET-G45 3W g45 e27 led bulb

 

Product Features:
Wattage: 3w
Chip: Epistar
* Voltage: AC 85-265V  50/60Hz
Lumen: 270-300lm
Installtion: E27 holder

 

Material: PLASTIC + ALUMINUM
Color Temperature: 2700K-6500k
Power Factor: >0.90
CRI: 80
Warranty: three years

Packaging Details:
CARTON
Carton Dimensions: 34*34*31 cm
Quantity/Carton: 25pcs
Quantity of 20GP/40GP/40HQ: 
18850/40450/47450pcs 

Certificates:
ISO9001:2000 / CE / EMC / RoHS/ LVD/ ERP reports

 

 

Logistics Ability:
Arrange the Mixed logistical for Election delivery as By Air and By Sea, over 10 years’ experience for logistical arrange.
Delivery Time:
Material Preparation Time: 10 days
Assembly & Packaging Time: 15 days
Total Delivery Time: 25 days in 50,000pcs for safe delivery lead time.
The faster delivery could be negotiable.
Factory Scale:
Total Area of: 5000 square meters (538193 square feet)
Production Staff: 100 to 200
QC Staff: 10 to 20
R&D Staff: 6 to 10
Application:
Home, Meeting room, Exhibition,  Hospital; Hotel; Office; Library; Super market; indoor lighting

-

Q1Can I have a sample for testing?

A:Yes, we can offer free sample, but you should afford the shipping cost.

Q2: Can I add my logo on the products?

A:Yes, OEM and ODM are available for us.

Q3How can I get the after-service?

A: We will send you the free spare parts if the problems caused by us. If the products can not be repaired, we will send you new free quantity together with next order.

Q4Do you have inspection procedures for products?

A: our products100% self-inspection and testing before packing. 

Q5Can I have a visit to your factory before the order?

A:Sure,welcome to visit our factory.

Here is our factory address:  #7 Tongyi Industrial Area, Zhongshan City, Guzhen

Our factory is near Guangzhou airport, and we can pick you up in the airport,   Hotel booking service is available.

Q6How about delivery time of the order?

A: 15-20 days after getting deposit.

Q7How about payment terms?

A:  20%-30% deposit, the rest payment balance against B/L. If have regular order and good order quantity, we can give delay payment.

询价单
total0items  Comments