- Type:
- Flex LED Strips
- Input Voltage(V):
- DC12V
- Lamp Power:
- 7.2W
- Lamp Luminous Flux(lm):
- 10-12
- CRI (Ra>):
- 80
- Working Lifetime(Hour):
- 80000
- Lamp Body Material:
- Aluminum
- Certification:
- CE, RoHS
- Place of Origin:
- Guangdong, China
- Brand Name:
- SHCET
- Light Source:
- LED
- Product Name:
- RGB/RGBWled strip light 5050/2835100m/roll220-240v
- LED Quantity:
- 30 LEDs/m
- Lumens:
- 10-12lm
- Power:
- 7.2W
- Voltage:
- DC12V
- Length:
- 5M
- IP Rating:
- IP20/IP44
- Package:
- 5M*2/1 roll/1 bag
- Light Color:
- single
- Color:
- OutdoorWaterproof Rgb 5050 solar powered led flexiblestrip lights
- Item Type:
- Light Strips
- Emitting Color:
- White
- LED Light Source:
- SMD5050
- Color Temperature(CCT):
- 6000-6500K
- Supply Ability:
- 100000 Meter/Meters per Week rgbw led strip
- Packaging Details
- Plastic bag+inner color box+outer carton for cara pasang lampu RGB/RGBWled strip light 5050/2835100m/roll220-240v
- Port
- HUANGPU
- Lead Time:
- Shipped in 25 days after payment
cara pasang lampu RGB/RGBW led strip light 5050/2835 100m/roll 220-240v
Product Features with cara pasang lampu RGB/RGBW led strip light 5050/2835 100m/roll 220-240v
*Type:SMD 5050 *Wattage: 7.2w *Voltage: DC12V *Lumen: 10-12Lm *Installtion: |
*IP Rating:IP20/IP44 *Color :Single *LED Quantity:30LED/M *Packge: 5M*2/1 roll/1 bag *Length: 5m/piece
|
Certificates: IS09001:2000/CE/EMC/RoHS/LVD/ERP | Logistics Ability: Arrange the Mixed logistical for Election delivery as By Air and By Sea. over 10 years’ experience for logistical arrange |
Delivery Time for cara pasang lampu RGB/RGBW led strip light 5050/2835 100m/roll 220-240v Material Preparation Time 10 days Assembly & Packaging Time: 15 days Total Delivery Time 25 days in 50,000PCS for safe delivery lead time The faster delivery could be negotiable | Factory Scale: Total Area of 5000 square meters (538193 Production Staff 100 to 200 QC Staff: 10 to 20 R&D Staff: 6 to 10 |
Application for cara pasang lampu RGB/RGBW led strip light 5050/2835 100m/roll 220-240v Factory, Building, Stadium, Flyover, Monument, Park
COMPARE SIMILAR PRODUCTS
|
cara pasang lampu RGB/RGBW led strip light 5050/2835 100m/roll 220-240v
Can I have a sample for testing?
Yes, we can offer free sample, but you should afford the shipping cost.
Can I add my logo on the products?
Yes, OEM and ODM are available for us.
How can I get the after-service?
We will send you the free spare parts if the problems caused by us. If the products can not be
repaired, we will send you new free quantity together with next order.
Do you have inspection procedures for products?
our products100% self-inspection and testing before packing.
Can I have a visit to your factory before the order?
Sure,welcome to visit our factory.
Here is our factory address: #7 Tongyi Industrial Area, Zhongshan City, Guzhen Our factory is
near Guangzhou airport, and we can pick you up in the airport, Hotel booking service is available.
How about delivery time of the order?
15-20 days after getting deposit.
How about payment terms?
20%-30% deposit, the rest payment balance against B/L. If have regular order and good order
quantity, we can give delay payment.