- Piling Speed(m/min):
- 3
- Efficiency:
- 10-30m
- After-sales Service Provided:
- Video technical support, Online support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service
- Warranty:
- 1 Year
- Applicable Industries:
- Hotels, Garment Shops, Building Material Shops, Manufacturing Plant, Food & Beverage Factory, Farms, Restaurant, Home Use, Retail, Food Shop, Printing Shops, Construction works , Energy & Mining, Food & Beverage Shops, Advertising Company
- Condition:
- New
- Place of Origin:
- Shandong, China
- Brand Name:
- Hengwang
- Weight:
- 3500kg
- Dimension(L*W*H):
- 2600*2250*2500
- Certification:
- ISO
- Name:
- Guardrail Pile Driver
- Engine Type:
- 140FAGasoline Engine
- Drill diameter:
- 90-500mm
- Operating principle:
- High Frequency
- Usage:
- Guardrail Pile
- Drilling depth:
- 1.4-2.6m
- Keywords:
- Pile Driver
- Hydraulic hammer model:
- YC260
- Impact frequency:
- 700-1350Bpm
- Multi functions:
- Post Ramming
- Supply Ability:
- 1000 Set/Sets per Year
- Packaging Details
- standard package
- Port
- Qingdao
- Lead Time:
Quantity(Sets) 1 - 1 >1 Est. Time(days) 7 To be negotiated
Hydraulic post installation highway guardrail pile driver
Product instruction
I. Building area
1. Highway guardrail drilling, piling, pulling pile.
2. Installation of spiral pile in photovoltaic power plant.
3. other various places piling (such as farms, pastures, orchards, etc.)
4. Highway field construction.zmwm02
II . the performance characteristics
1. Reasonable power, superior performance of the diesel engine, for the construction operations to provide a powerful power circle, the reliability of power, fuel economy, has been greatly improved.
2. Cash of the hydraulic system, high-quality hydraulic original strict assembly process to ensure that the hydraulic system of high efficiency and durability.
3. The overall frame structure is fine, the material is completely national standard. High strength, good stability, in line with industrial aesthetic design ideas, the operator work space more spacious.Hydraulic post installation highway guardrail pile driver
4. Production process more reasonable, wear parts are used heat treatment process. Welding process is strictly prohibited, the framework of the overall stress to deal with welding to reduce the deformation, detection equipment.
Technology Parameter
Specifications | Unit | HWS-23D | HWS-26D | HWS-36D | |
Hydraulic hammer model |
| 230 | 260 | 360 | |
Drill rod diameter | mm | 68 | 75 | 85 | |
Engineer power | kw | 31 | |||
Hydraulic system pressure | mpa | 16-20 | 16-20 | 16-20 | |
The hydraulic system flow rate | ml/r | 63-80 | 63-80 | 63-80 | |
Nitrogen gas pressure range | Mpa | 1±0.1 | 1.7±0.1 | 1.7±0.1 | |
Hydraulic hammer impact frequency | bpm | 500-900 | 400-800 | 400-800 | |
Hydraulic hammer work flow | l/min | 40-70 | 50-90 | 50-90 | |
Working pressure of hydraulic hammer | Mpa | 9-11 | 11-14 | 12-15 | |
Working stroke of hydraulic hammer | mm | 450-2800 | 450-2800 | 450-2800 | |
Piling efficiency | mm/min | 2100 | 2400 | 2700 | |
Net weight | kg | about 2000 | about 2100 | about 2200 | |
Steel post diameter | mm | 90mm-500mm | |||
Maximum ramming depth | mm | 2000 | |||
Maximum post length | mm | 2600 | |||
Drilling diameter | mm | 120,150,160,180,200 | |||
Drilling depth | mm | 1700 | |||
Maximum traction speed | km/h | ≤30 | |||
Traveling Speed | km/h | 8-12 | |||
Hydraulic tank volume | L | 80 | |||
Dimension(L*W*H) | mm | 2600*2250*2500(folded)*3700 |
Product Real Photos
Pile driver Suitable for the following sharp of post
Our company
Contact us
Skype:lh.cici
Phone:0086-537-2582838
Email:hw018AThengwanggk.com
Whatsapp/Wechat/Viber: + 8615965109869
Shandong Hengwang Group Co,.Ltd