Homepage|Business Center|Save the Page|Get the App
普通会员

Zhejiang Tianqi Electric Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > TIBOX pump controller low tension distribution box Control panel cabinet
TIBOX pump controller low tension distribution box Control panel cabinet
Click on the image to view the original image
Product: views:7TIBOX pump controller low tension distribution box Control panel cabinet 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-17 20:59
  Negotiated
Product Details
 
Product Description

Inner/ inernal door electric distribution control panel board IP66 Wall Mounting housings/ cabinets/panels (distribution boxes) Specifications

 

1. Material:  sheet steel & Cold Rolled Steel

 

2. Thickness: enclosure & door: steel sheet 1.2mm till size ST6-820, then 1.5mm

                          mounting plate: zinc-coated steel 1.5mm till size ST6-820, then 2.0mm

 

3. Supply Include: 1). enclosure and door;

                                  2). mounting plate;

                                  3). lock system;

                                  4). gland plate;

                                  5). sealing gasket;

                                  6). fixing accessories.

 

4. Surface finish

-Enclosure & door: thermosetting expoxy polyester powder coating in textured RAL 7032 & RAL7035

-Mounting plate: zinc coated

 

5. Protection degree:

-Protection degree:IP66

-Impact resistaance:IK10

 

 

Packaging & Shipping

 

Packing details: In cartons

 

Delivery detail: 1x40HQ in 45 days 

 

 

Our Services

 

 

 

 

Company Information

 1. Payment

1) 20% by T/T in advanced,80% against B/L copy

2) 30% by T/T in advanced,70% against B/L copy

3) 100% by T/T in advanced.

4) 100% by LC at sight

5) if you order amount less than 1000USD,you can through the paypal to pay.

 

2. Delivery time

1).Metal enclosure: In 45-60days after confirmed the order.

2) Plastic enclosure: within 30days after confirmed the order.

3) Sample: within 15days after conifrmed the order.

 

3. Term:

FOB, CFR, EX-FACTORY.......

 

 

询价单
total0items  Comments