Product Paramenters
Lonyung Led Lighting Discounted Inventory 2ft 4ft 8ft T8 Integrated Tube Light 5000-5500K Linkable | ||||||||||||||
Item No: | Length (mm/ft): | Power: | PC Cover: | Color Temperature: | Efficiency: | Luminous Flux: | Ra | |||||||
LY-T8DL600-9W | 600mm/2ft | 9w | Milky/Clear | 2700-6500K | 120lm/w | 1080lm | ≥80 | |||||||
LY-T8DL900-13W | 900mm/3ft | 13w | Milky/Clear | 2700-6500K | 120lm/w | 1560lm | ≥80 | |||||||
LY-T8DL1200-18W/22W | 1200mm/4ft | 18w or 22W | Milky/Clear | 2700-6500K | 120lm/w | 2640lm | ≥80 | |||||||
LY-T8DL1500-22W/25W | 1500mm/5ft | 22 or 25w | Milky/Clear | 2700-6500K | 120lm/w | 3000lm | ≥80 | |||||||
LY-T8DL1800-28W | 1800mm/6ft | 28w | Milky/Clear | 2700-6500K | 120lm/w | 3360lm | ≥80 | |||||||
LY-T8DL2400-36W/44W | 2400mm/8ft | 36w or 44w | Milky/Clear | 2700-6500K | 120lm/w | 5280lm | ≥80 | |||||||
Inquiry Response:Your Inquires Will Be Replied Within 24 Hours ; Sample support:Samples Can Be Avaliable In 3 Days ; Customized Service: Products Design & Client Logo & Packing ; Delivery time :Normal Order 5-10days,Bulk Order 15-25 Days ; Payment term:T/T, Paypal. |
Specification
Input Voltage: AC100-277V 50-60HZ | Linkable max 200W and 600W optional | Patent Male-female linkable design | ||
SMD2835 led chip, >110Lm/W | Seamless Connection | Curved lens provides >120° beam | ||
Thickened 0.9mm aluminum radiator ,excellent heat dissipation
| ||||
Inner power efficiency more than 88%,80% saving energy than fluorescent tube |
Products Description
Application Scenarios
Customer Feedback
Please Contact Us For More Information
Instructions
1PC FIXTURE LIGHT/OPP BAG/INNER BOX
10-20 PCS FIXTURES/CARTON
10-20 PCS FIXTURES/CARTON
Company Profile
LONYUNG LED LIGHTING CO. LTD is a professional manufacturer of Led lighting products. We established in 2010 and dedicated in design, development, production and sales of Led products.
Manufacturing excellence and assuring the highest product standard is paramount, and our efforts in upgrading our facility and our processes has been recognized with the awarding of the IS09001: 2008 accreditation and Supplier Assessment Certifcate by BV, TUV, GS. R&D is our core power to keep us being innovative and productive. Until now. LONYUNG has obtained 69
patents in China. Also, our products are certificated under UL/ETL, TUV, SAA, Energy Star, DLC, ErP, LCP, CE, RoHS, C-TIck, IP66.
Our modern manufacturing plant occupy 8000 square meters and with more than 1 80 skilled workers, automatic SMT machine, IES testing system, automatic Packaging unit, automatic aging lines, Laboratory, our monthly production capacity achieves above 300,000 pieces of Led products. We succesfully built up long-term relationship with our partners from North America, Europe, Australia, Asia and other areas all over the world. Our products are widely used in office buildings, houses, and industrial areas.
LONYUNG Team sincerely welcomes your OEM/ODM requirements. We will always provide you excellent products and service with a competitive and reasonable cost.
Let's make success together.
About Lonyung Lighting
Exhibition & Certificate
QC Process & Packaging
FAQ
♥ Reliability
1. As Long As 72 Hour Aging Test With Automatic Switching Before Each Shipment;
2. 100% Vibratility Test Will Make Sure The Fastness Of The Assembling ;
3. 100% Resist Voltage Test Of AC85-305V Makes Sure Those Tubes Compatible For Both 120v And 277V ;
4. More Than 95% Lumen Maintenance Based On The 6000 Hour LM-80-08 Test ;
4. More Than 95% Lumen Maintenance Based On The 6000 Hour LM-80-08 Test ;
5. -40°C To 50°C(-40°F to 122°F) Extreme Environment Compliant.
♥ Shipping options
- By Express: Such As DHL,UPS, TNT, FEDEX Etc. The Dispatch Time Is About 3-7 Working Days;
- We Will Wearch For An Economical Shipping Company To Transport The Goods Safely ;
- Air Freight : When You Order More Than 100kg Which Will Be More Economical Than Express ;
- Agent Designated By Client : Please Tell Us The Contact Details Of Your Shipping Agent/Forwarder.
♥ Trade Terms
- Payment : T/T , 30% Deposits Before Production, 70% Balance To Be Paid Before Delivery;
- Production Delivery Time : 100~500pcs—7 Days, 500~1000pcs—10 Days ;
- Sample : Can Be Delivered In 3 Days ;
- Shipping port : ZHONGSHAN/SHENZHEN ;
-Discounts : Are Offered Based On Order Quantities.
♥ Any Questions & Enquiries, Please Do Not Hesitate To Contact With Us Directly!