DC24V 1903 rgb 45mm light e14 cabochons amusement carnival Led Pixel
Technical Parameters
Product Name | 45mm light e14 cabochons amusement carnival Led Pixel |
LED Quantity | 12 pcs smd 5050 rgb LEDs |
Work Voltage | DC24V |
Power Consumption(w) | 2.88W |
IC chip | UCS 1903 |
Beam Angel | 360 degree |
Installation hole | 15mm |
Diameter | 45mm |
Color | Full color |
Waterproof Grade | IP 65 |
Lifespan | 50,000 hours |
Warranty | 2 years |
Certificate | CE&RoHS |
Working Temperature | -20~60 degree |
Storage Temperature | -30~80 degree |
Product features
1. Individually control: 1PCS LED pixel & 1IC (1903).
2. Color and effect: addressable lights you can set to any color, or animate, like running water, chasing and scanning etc.
3. Combination: PVC shell (thermostability, cold-resistant, resistant to UV) and PCB board, connector cables.
4. Waterproof IP65, with silicon glue waterproof protection.
5. Easy to install, better drill the hole about 15 - 16mm.
6. With features of high brightness, low power dissipation, long lifespan, low Voltage, low decline, colorful.
7. Power supply should use a 24V DC power supply to power this pixel, do not use higher than 25V or it will burn the pixel.
8. Connectors: 3PIN JST female and male connectors, also can be waterproof connectors, DAT, DC24V+, GND.
Connection Way
1. Signal wire:DC+, DAT, GND,
2. DC+ and GND connect to power supplier; DAT and GND connect to controller
3. Relative Controller: SPI controller, DMX controller
4. SPI Signal:LED pixels + LED Power Supply + LED Controller
5. DMX Control:LED pixels + LED Power Supply + DMX Controller + DMX Decoder
Lighting Effect
Related Product
45mm 1903/2811 led pixel light
Control system
1. SD Controller T400K, T500K, T4000C, K1000C, K8000C; Online Controller; Artnet; Arduino and DMX controller.
2. Software to make program, now we often use LEDEDIT, LED EASY and MADRIX. Contact me for more information.
Application
1. Outdoor amusement park lighting,
2. Ferris wheels,Bumper car,
3. Outdoor signboard,
4. Carnival,
5. Amusement park rides,
6. Playground fair lighting,
7. Game machine,
8. Traveling funfair,
9. Funfair playground,
10. Park ride.
1.Goods will be delivered within 3-5 working days after the payment received
2.We ship item via DHL, Fedex,UPS,Door to Door service express or air and sea.
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A: Need about 3-5 days, mass production time needs 1-2 weeks for order quantity more than.
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.