Homepage|Business Center|Save the Page|Get the App
普通会员

Zhongshan GOLM Lighting Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Perfect Design no shadow E12 E14 E27 Energy Saving High Bright 7W led candle light Candelabra Led Bulb
Perfect Design no shadow E12 E14 E27 Energy Saving High Bright 7W led candle light Candelabra Led Bulb
Click on the image to view the original image
Product: views:8Perfect Design no shadow E12 E14 E27 Energy Saving High Bright 7W led candle light Candelabra Led Bulb 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-23 10:50
  Negotiated
Product Details

Perfect Design no shadow E12 E14 E27 Energy Saving High Bright led Bulb Light high power 7W led candle light Candelabra Led Bulb

 

 

 

 

Q1:Are you a manufacturer?

Yes. we are a manufactory ,specializing in the production of led bulb/led tube.

Q2: What is the Warranty for the lamps?

For the lamps,  2 year warranty. If any quality problems on our side occured in this period, we will take on the shipping cost and replacement.

Q3:What is colour temperature?

Our LED Lighting offer lamps in warm, pure, and pure and cool white with temperatures measured in Kelvin(K). Te lower the colour temperature is the light given by the LED.
Warm white = 2700k-3200k
Pure white = 4000k-5500k
Cool white = 6000k-7200k

Q4: what is CRI?

CRI is a figure which feedback the real objects colors. Higher CRI with higher cost for LED Tudes , the CRI is mostly 70-75Ra, and 80Ra with hagher cost. But three are some suppliers write a high data to attract client, please note.

Q5: Can we customize our brand and get support if we have our own market position?

Yes.We welcome our customize, and please inform us your detailed mind on your market demand, we will discuss and propose helpful suggestion for you, t find the best solution for you.

Q6:How many days will samples be finished? and how about the mass production?

1. Generally speaking.. 5-7days for samples making..10-15days for bulk order.
2. The lead time of mass production would depand on quantity. etc.

For any necessary or help, please feel free to contact us, you will get reply at 

the first time. 

 

询价单
total0items  Comments