Overview
Quick Details
- Light Source:
- LED
- Input Voltage(V):
- 220
- Lamp Luminous Flux(lm):
- 864
- CRI (Ra>):
- 80
- Working Lifetime(Hour):
- 30000
- Lamp Body Material:
- Aluminum
- IP Rating:
- IP44
- Certification:
- CCC, CE, RoHS
- Model Number:
- HL-D001
- Place of Origin:
- Guangdong, China
- Brand Name:
- HL
- Application:
- HOTEL
- Install Style:
- Embeded
- Switch Type:
- Touch On/Off Switch
- Warranty(Year):
- 2-Year
- Power:
- 7W/2.5 inch,12W 3.5 inch.15W/4 inch; 24W/inch
- colour temperature:
- 3000K/4000K/6000K
- Surface diameter:
- 100mm hole 78mm
- Face diameter::
- 180mm Open hole 160mm
- Material::
- die casting aluminum spray white
- Warranty:
- 2 years
Packaging & Delivery
- Selling Units:
- Multiple of
- Package size per batch:
- 75X31X41 cm
- Gross weight per batch:
- 6.5 kg
- Package Type:
- Foam bag +gift box+ outer carton 50 pcs/ctn, 75x31x40 cm
- Picture Example:
- Lead Time:
Quantity(Piece) 1 - 50 >50 Est. Time(days) 3 To be negotiated
Detailed Images
Product Presentation
Downlight ceiling light | |
die casting aluminum spray white | |
7W/2.5 inch,12W 3.5 inch.15W/4 inch; 24W/inch | |
220V | |
circular | |
HL-D00 | |
Style | colour temperature :3000K/4000K/6000K,Surface diameter 100mm hole 78mm |
Related Products
Packing&Shipping
FAQ
We are a manufacturer of lamps and lights. Our factory is located in Hengran Town and Guzhen Town, Zhongshan City, China.
We have production and supply of LED commercial lighting, outdoor lamps and indoor track lights, down lights, spot lights and LED emergency induction lamps
advised our factory can be customized according to your specifications, and custom-made chandeliers that are the same as your requirements
Have you any question for products,kindly please cab be contact with me freely,i will be follow-up these and reply to you ASAP
The corresponding lamps and lanterns can be customized according to the needs of users. | Pre-order sample confirmation can be provided, with the first batch of MOQ accepting 20 to 50 PCS | Warranty:2 years | After the order is confirmed, the existing goods can be shipped in 3 days. The lamps and lights need to be customized and required to be completed at 7 to 10 days. | |
Accept to provide spare materials to be shipped together according to the quantity of the orde | FOB Zhongshan/Guang zhou, pays the advance payment to confirm the order and arrange the material preparation in advance, and the balance payment before shipment | |||