Related Products
Product Description
crystal dandelion chandelier Nordic living room lamp for modern restaurant bedroom lighting









Detailed Images

G9 energy-saving light source
Using G9 light source, energy saving and power saving, warm brightness

Crystal lamp body+Electroplating high temperature baking varnish lamp body
High-quality crystal lamp beads, the light is more translucent. Electroplating high temperature baking varnish lamp body, anti-oxidation and corrosion resistance

Iron chassis
The wrought iron golden chassis has strong bearing capacity, and the hanging wire can be adjusted at will,
Introduction of product advantages or application effect or application mode

Professional packaging and delivery
Detailed picture of the lamp body, electroplating high temperature baking paint, delicate texture


Professional installation drawings, clear steps, worry-free installation
Product Presentation

Crystal chandeliers | |
Iron + crystal | |
G9 | |
110V-240V | |
Overall packaging | |
HX-5479 | |
Style | Modern chandelier |
Certificate



Company Introduction



Packing&Shipping

FAQ
Q1: Do you have certificates about the led lights?
A1: Yes, all our product are high quality, we have got CE, RoHS, EMC, LVD certificates.
Q2: How to control the quality of the goods?
A2: Our products have passed QC quality test, 2 years warranty, 50,000 hours working span, will be tested for 24 hours before
shipping.
Q3: How you can do for when the goods have problem within 2 years?
A3: If the goods have some problem then we will assist you to solve it, we should check the problem first, then send the materis
or send new goods to you.
Q4: Which payment do you accept?
A4: We will accept T/T, western union, paypal, L/C etc. as your request.
Q5: How about the delivery time?
A5: Sample order within 3 working days, 3-7 working days for normal order, 10-30 working days for mass order.
A1: Yes, all our product are high quality, we have got CE, RoHS, EMC, LVD certificates.
Q2: How to control the quality of the goods?
A2: Our products have passed QC quality test, 2 years warranty, 50,000 hours working span, will be tested for 24 hours before
shipping.
Q3: How you can do for when the goods have problem within 2 years?
A3: If the goods have some problem then we will assist you to solve it, we should check the problem first, then send the materis
or send new goods to you.
Q4: Which payment do you accept?
A4: We will accept T/T, western union, paypal, L/C etc. as your request.
Q5: How about the delivery time?
A5: Sample order within 3 working days, 3-7 working days for normal order, 10-30 working days for mass order.