- Place of Origin:
- Zhejiang, China
- Brand Name:
- Zhuiming
- Bulb Type:
- LED
- Battery Type:
- Ni-Cd
- Material:
- Electro-galvanized Steel Casing ,PC Plate
- Usage:
- Lightingfor shopping mall, office building
- Certification:
- CE
- Specifications:
- 1 Watt SMD White LED
- Emergency Ceiling LightOperation:
- Non-maintained
- Emergency Ceiling LightWarrange:
- 3 years
- Emergency Ceiling LightDuration time:
- >3 hrs
- Emergency Ceiling LightConstruction:
- Electro-Galvanized Steel Casing ,PC Plate
- Emergency Ceiling LightIndicator:
- Red LED Indicates Charging
- Emergency Ceiling LightIP Rate:
- IP20
- Emergency Ceiling LightInstallation:
- Ceiling Recessed Mounted
- Emergency Ceiling LightLamp Usage:
- 1 watt SMD White LED
- Emergency Ceiling LightBattery:
- Nickel-Cadmium Battery 3.6V 1.0Ah
- Emergency Ceiling LightCustomization:
- Battery, Duration Time, Package
- Supply Ability:
- 3000 Piece/Pieces per Day Emergency Ceiling Light
- Packaging Details
- Emergency Ceiling Light Packing:1 set in 1 Inner Carton, 20 sets in 1 Master Carton. Or as for your request.
- Port
- Shanghai/Ningbo
1 Watt SMD White LED Non-maintained Emergency Ceiling Light
Parameters
Operation | Non-maintained |
Input Voltage | 110V-127V 50/60Hz;220V-240V 50/60Hz |
Charging Current | 120mA(Nominal) |
Lamp type | 1 watt SMD White LED |
Battery | Nickel-Cadmium Battery 3.6V1.0Ah |
Indicator | Red LED Indicates Charging |
Duration Time | More than 3 hours |
Construction | Electro-Galvanized Steel Casing with Corrosion Resistant Epoxy Spray Coating;PC Plate |
IP Rate | IP20 |
Installation | Ceiling Recessed Mounted |
Weight | 0.5kg |
Working Temperature | -10℃ to 55℃ |
Size | 350mm×110mm×38mm Tolerance ±0.03mm |
Customization | Battery, Duration Time, Package |
Package Information
Package | 1 Set in 1 Inner Carton, 20 Sets in 1 Master Carton |
Master Carton Size | 405mm×370mm×235mm |
Gross Weight | 11.7kg |
Net Weight | 9.85 kg |
Product Shows
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shopping malls, office buildings,government buildings, teaching buildings, residential buildings, hospitals, dormitories and so on.
Certificate
Our products are guaranteed by CE and RoHS
Delivery Time
- 35 days on receipt of your payment
Hot Sale
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
1)Silk print logo on the product
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
1)All products will be strictly quality checked before packing.
2)All products will be well packed before shipping.
3)All products and most of accessories have 3 year warranty.
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1580m2
3. Main Products
1. Emergency Lights
2. Exit Sign Lights
3. Emergency Power Supply
4.Exhibitions & Fairs
- 2015 Hong Kong International Lighting Fair (Spring Edition)
- 19th Guangzhou International Lighting Exhibitions
- 115th Canton Fair 2014 Spring
- Russian Exhibition 2013 Winter
4.Certificates
- SGS Factory
- CE & Rohs
- IP20
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main differences are power consumption and life span.
For same brightness, the power consumption of fluorescent lamps are 2 to 3 times more than LED lamps.
The life span of LED lamps are 10 times longer than fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.