- Place of Origin:
- Zhejiang, China
- Brand Name:
- ZhuiMing
- Bulb Type:
- LED
- Battery Type:
- Ni-Cd
- Material:
- Electro-Galvanized Steel Casing, with PC Diffuser
- Usage:
- LED Light for shopping mall, office building
- Certification:
- CE
- Specifications:
- 30 pcs SMD 3014 LED
- Exit Light Sign Operation:
- maintained
- Exit Light Sign Battery:
- Ni-Cd Battery 3.6V 1.0Ah
- Exit Light Sign Indicator:
- Green LED Indicates Charging
- Exit Light Sign Construction:
- Electro-Galvanized Steel Casing, With PC Diffuser
- Exit Light Sign Lamp Usage:
- 30 pcs SMD 3014 LED
- Exit Light Sign Warranty:
- 3 Years
- Exit Light Sign Duration Time:
- 3 hrs
- Exit Light Sign Installation:
- Wall Surface Mounted
- Exit Light Sign Size:
- 390mmX190mmX60mm, Tolerance ±0.03mm
- Exit Light Sign Customization:
- Battery, Duration Time, Package
- Supply Ability:
- 3000 Piece/Pieces per Day Exit Light Sign
- Packaging Details
- Exit Light Sign Packing:1 Piece in 1 Inner Carton,6 Pieces in 1 Master Carton, Or As For Your Request
- Port
- Shanghai/Ningbo
IP42 and Ni-Cd Battery Wall Surface Mounted Led Emergency Exit Light Sign
Parameters
Operation | Maintained |
Input Voltage | 110V-127V 50/60Hz;220V-240V 50/60Hz |
Charging Current | 120mA(Nominal) |
Lamp type | 30 pcs SMD 3014 LED |
Battery | Nickel-Cadmium Battery 3.6V/1.0AH |
Indicator | Green LED Indicates Charging |
Duration Time | More than 3 hours |
Construction | Electro-Galvanized Steel Casing of High Reflectance Finished with Corrosion Resistant Epoxy Spray Coating; and with PC Diffuser; |
IP Rate | IP42 |
Installation | Wall Surface Mounted |
Weight | 2.2 kg |
Working Temperature | -10℃ to 55℃ |
Size | 390mm×190mm×60mm Tolerance ±0.03mm |
Customization | Battery, Duration Time, Package |
Package Information
Package | 1 Set in 1 Inner Carton, 6 Sets in 1 Master Carton |
Master Carton Size | 425mm×415mm×230mm |
Gross Weight | 15.54 kg |
Net Weight | 12.65 kg |
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shopping malls, office buildings,government buildings, teaching buildings, residential buildings, hospitals, dormitories and so on.
Certificate
Our products are guaranteed by CE and RoHS
Package
- 1 Piece in 1 Inner Carton
- 6 Pieces in 1 Master Carton
- Master Carton Size: 425mmX415mmX230mm
- G.W:15.54KG
- N.W:12.65KG
Delivery Time
- 35 days on receipt of your payment
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
1)Silk print logo on the product
2)Customized products
3)Customized package
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
1)All products will be strictly quality checked before packing.
2)All products will be well packed before shipping.
3)All products and most of accessories have 3 year warranty.
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1100m2
3.Exhibitions & Fairs
- 2015 Hong Kong International Lighting Fair (Spring Edition
- 19th Guangzhou International Lighting Exhibitions
- 115th Canton Fair 2014 Spring
- Russian Exhibition 2013 Winter
4.Certificates
- SGS Factory
- CE & Rohs
- IP42
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.