- Place of Origin:
- Zhejiang, China
- Brand Name:
- Zhui Ming
- Model Number:
- epoxy resin for led sign(SL030AM)
- Bulb Type:
- LED
- Battery Type:
- Ni-Cd
- Material:
- aluminum
- Usage:
- Shopping mall, Office building
- Certification:
- CE
- Specifications:
- 30 SMD 3014 LED
- Warranty:
- 3 years
- Duration Time:
- >3HRS
- Input Voltage:
- 110V-127V 50/60HZ, 220V-240V 50/60HZ
- Construction:
- Electro-Galvanized Steel Casing; and with PC Diffuser
- IP Rate:
- IP20 epoxy resin for led sign
- Charging Current:
- 120mA(Nominal)
- Installation:
- wall surface mounted
- Indication:
- Green LED Indicates Charging
- Product Size:
- 392mmx190mmx60mmTolerance ±0.03mm
- Weight:
- 1.35KG
- Supply Ability:
- 3000 Piece/Pieces per Day
- Packaging Details
- 1 Piece In 1 Inner Carton, 6 Pieces In 1 Master Carton, Or As For Your Request
- Port
- Shanghai/Ningbo
Double Side Running Man Rechargeable Epoxy Resin for Led Sign
Parameters
Operation | Maintained |
Input Voltage | 110V-127V 50/60Hz;220V-240V 50/60Hz |
Charging Current | 120mA(Nominal) |
Lamp type | 30 pcs SMD 3014 LED |
Battery | Nickel-Cadmium Battery 3.6V/1.6AH |
Indicator | Green LED Indicates Charging |
Duration Time | More than 3 hours |
Construction | Electro-Galvanized Steel Casing of High Reflectance Finished with Corrosion Resistant Epoxy Spray Coating; and with PC Diffuser; |
IP Rate | IP20 |
Installation | Wall Surface Mounted |
Weight | 1.35 kg |
Working Temperature | -10℃ to 60℃ |
Size | 392mm×190mm×60mm Tolerance ±0.03mm |
Customization | Battery, Duration Time, Package |
Product Shows
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shopping malls, office buildings,goverment buildings, teaching buildings, Dormitories and so on
Certificate
CE, RoHS are safe guarantee of our products
Package
- 1 Piece in 1 Inner Carton ,6 Pieces in 1 Master Carton
- Master Carton Size: 425mm×415mm×230mm
- G.W:15.54
- N.W:12.65
Delivery Time
- 20~35 days on receipt of your payment for emergency industrial light
Before Sale
- The battery ,duration time,indication ,package can be customized.
- OEM can be accepted.
After sale
- Warranty:3 years
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1100m2
3.Exhibitions & Fairs
- 19th Guangzhou International Lighting Exhibitions
- 115th Canton Fair 2014 Spring
- Russian Exhibition 2013 Winter
4.Certificates
- SGS Factory
- CE & Rohs
- IP65
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.