- Place of Origin:
- Zhejiang, China
- Brand Name:
- Zhui Ming
- Model Number:
- explosion-proof lighting fixture (EF108A)
- Bulb Type:
- Fluorescent
- Battery Type:
- Ni-Cd
- Material:
- ABS Body & PC Diffuser
- Usage:
- Shopping mall, Office building
- Certification:
- CE
- Specifications:
- 1X8W TUBE
- Warranty:
- 3 years
- Emergency Time:
- >3 hrs
- IP Rate::
- IP65 explosion-proof lighting fixture
- Battery:
- 3.6V 2.5Ah Ni-Cad
- Size:
- 345*107*76MM
- Input Voltage:
- 110V-127V 50/60Hz;220V-240V 50/60Hz
- Indicator:
- Green LED Indicates Charging
- Construction:
- Fire-Retardant ABS Casing and PC Diffuser
- Installation:
- Wall and Ceiling Surface Mounted
- Weight:
- 0.8KG
- Supply Ability:
- 3000 Piece/Pieces per Day
- Packaging Details
- Package: 1 Set in 1 Inner Carton, 10 Sets in 1 Master Carton,Or As For Your Request
Master Carton Size: 450mm*370mm*260mm
Gross Weight: 12 kg
Net Weight:10.7 kg
- Port
- Shanghai/Ningbo
Specifications
IP65 Fluorescent Emergency Explosion-proof Lighting Fixture
1.ABS Casing, PC Diffuser
2.Emergency time>3HRS
3.IP65
IP65 Fluorescent Emergency Explosion-proof Lighting Fixture
EF108A
Parameters
Operation | Maintained or Non-maintained |
Input Voltage | 110V-127V 50/60Hz;220V-240V 50/60Hz |
Charging Current | 120mA(Nominal) |
Lamp type | 8 Watt Fluorescent Tube |
Battery | Nickel-Cadmium Battery 3.6V1.6AH |
Indicator | Green LED Indicates Charging |
Duration Time | More than 3 hours |
Construction | Fire-Retardant ABS Casing and PC Diffuser |
IP Rate | IP65 |
Installation | Wall Surface Mounted, Ceiling Surface Mounted |
Weight | 0.8kg |
Working Temperature | -10℃ to 60℃ |
Size | 345mm×107mm×76mm Tolerance ±0.03mm |
Customization | Battery, Duration Time, Package |
Detailed Pictures
Features
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shoping malls, office buildings,goverment buildings, teaching buildings, Domitories and so on.
Packaging
Package | 1 Set in 1 Inner Carton, 10 Sets in 1 Master Carton |
Master Carton Size | 450mm×370mm×260mm |
Gross Weight | 12 kg |
Net Weight | 10.7 kg |
Delivery Time
20~30 days on receipt of your payment
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
1)Silk print logo on the product
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
1)All products will be strictly quality checked before packing.
2)All products will be well packed before shipping.
3)All products and most of accessories have 3 year warranty.
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1100m2
3.Exhibitions & Fairs
- 19th Guangzhou International Lighting Exhibitions
- 115th Canton Fair 2014 Spring
- Russian Exhibition 2013 Winter
4.Certificates
- SGS Factory
- CE & Rohs
- IP65
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.