LED Bulkhead Frosted Cover Emergency Rechargeable Light
Parameters
Operation | Non-Maintained |
Input Voltage | 110V-127V 50/60HZ,220V-240V 50/60HZ |
Charging Current | 120mA(Nominal) |
Lamp Used | 3/6pcs SMD 5730 White LED |
Battery | Nickel-Cadmium Battery 3.6V 0.6AH / 3.6V 1.8AH |
Indication |
Red LED Indicates Charging,Green LED Indicates Poweron |
IP Rate | IP20 |
Installation | Wall Surface Mounted |
Weight | 0.25KG |
Product Size | 238mmx80mmx40mm Tolerance ±0.03mm |
Features
Operating Temperature | -10°C to 55°C |
Construction | Fire-Retardant ABS Casing and plate, PS Diffuser |
Duration Time | >3HRS |
Product Shows
Function
Over 3hrs emergency lighting after sudden blackout
Application
For shoping malls, office buildings,goverment buildings, teaching buildings, hospitals and so on.
Certificate
Our products are guaranteed by CE and RoHS
Delivery Time
- within 30 days on receipt of your payment
Hot Sale
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
1)Silk print logo on the product
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
1)All products will be strictly quality checked before packing.
2)All products will be well packed before shipping.
3)All products and most of accessories have 3 year warranty.
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1580m2
3. Main Products
1. Emergency Lights
2. Exit Sign Lights
3. Emergency Power Supply
4.Exhibitions & Fairs
- 2015 Hong Kong International Lighting Fair (Spring Edition)
- 19th Guangzhou International Lighting Exhibitions
- 115th Canton Fair 2014 Spring
- Russian Exhibition 2013 Winter
4.Certificates
- SGS Factory
- CE & Rohs
- IP20
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main differences are power consumption and life span.
For same brightness, the power consumption of fluorescent lamps are 2 to 3 times more than LED lamps.
The life span of LED lamps are 10 times longer than fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.