Homepage|Business Center|Save the Page|Get the App
普通会员

Hangzhou Dreamy Technology Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > CE 2W Autotesting LED emergency Exit Double Side Sign
CE 2W Autotesting LED emergency Exit Double Side Sign
Click on the image to view the original image
Product: views:4CE 2W Autotesting LED emergency Exit Double Side Sign 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-23 10:00
  Negotiated
Product Details

CE 2W Autotesting LED emergency Exit Double Side Sign

 

 

 

 

Parameters

Operation

Maintained

Input Voltage

110V-127V 50/60Hz;220V-240V 50/60Hz

Charging Current

120mA(Nominal)

Lamp type

30 pcs SMD 3014 LED

Battery

Nickel-Cadmium Battery 3.6V/1.0AH

Indicator

Green LED Indicates Charging

Duration Time

More than 3 hours

Construction

Electro-Galvanized  Steel  Casing  of  High

Reflectance  Finished  with  Corrosion  Resistant Epoxy Spray Coating; and with PC Diffuser;

IP Rate

IP42

Installation

Wall Surface Mounted

Weight

2.2 kg

Working Temperature

-10℃ to 55℃

Size

392mm×190mm×60mm

Tolerance ±0.03mm

Customization

Battery, Duration Time, Package

 

Package Information

 

Package

1 Set in 1 Inner Carton, 6 Sets in 1 Master Carton

Master Carton Size

425mm×415mm×230mm

Gross Weight

15.54 kg

Net Weight

12.65 kg

 

 Production shows

 

 

 

 

Function

Over 3hrs emergency lighting after sudden blackout

 

Application

For shopping malls, office buildings,government buildings, teaching buildings, residential buildings, hospitals, dormitories and so on.

 

Certificate

Our products are guaranteed by CE and RoHS

 

 

 

 

Packaging & Shipping

 

Package

  • 1 Piece in 1 Inner Carton 
  • 6 Pieces in 1 Master Carton
  • Master Carton Size: 425mmX415mmX230mm
  • G.W:15.54KG
  • N.W:12.65KG

Delivery Time

  •  35 days on receipt of your payment 

 

 

Our Services

 

1.Any Inquiries will be replied within 24 hours.

2. Professional manufacturer.

3. OEM/ODM available:

1)Customized products

2)Customized package

4. High quality, fashion designs, reasonable & competitive price, fast lead time. 

5. After-sale service

1)All products will be strictly quality checked before packing.

2)All products will be well packed before shipping.

3)All products and most of accessories have 3 year warranty.

Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.

6. Payment

You can pay for the order via: TT, Western Union, MoneyGram, L/C

 

Company Information

1. Established in 2008, Hangzhou, China

2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1100m2

 

3.Exhibitions & Fairs

 

  • 2015 Hong Kong International Lighting Fair (Spring Edition
  • 19th Guangzhou International Lighting Exhibitions
  • 115th Canton Fair 2014 Spring
  • Russian Exhibition 2013 Winter

4.Certificates

  • SGS Factory
  • CE & Rohs
  • IP42

5.Equipments

  • Intergrating Spheres: to measure brightness(luminous flux)
  • Wave Soldering Machine: to solder PCBs
  • Aging Test Board: to test products performance and select good products
  • Constant Temperature Humidity Chamber: to simulate different environment condition and test products

 

 

 

 

 

 

 

FAQ

 

1. What is the main differences of Fluorescent lamp and LED?

Main difference is power consumption and life span.

For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.

The life span of LED lamps 10 times that of fluorescent lamps.

2. How about the life span of LED Lamps.

Under normal condition, it is about 50000h.

3. Is the company a trading company or a factory?

The company is a factory, and we do export by ourselves.

4. ODM or OEM is acceptable?

Yes, both of them is acceptable.

5. How about the delivery time?

For normal products, the delivery time is 1 month for MOQ.

For  customized products, the delivery time will be different accordingly.

6.What can be customized?

Battery

Package

Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.

 

 

 

询价单
total0items  Comments