3W Recessed Red Lamp Led Bulkhead Light Recessed Type Emergency Light
Parameters:
Operation | Non-Maintained |
Input Voltage | 110V-127V 50/69HZ;220V-240V 50/60HZ |
Charging Time | 24 Hours |
Lamp Used | 15 pcs 2835 SMD LED |
Battery | Nickel Cadmium Battery 3.6V/1.0AH |
Indication | RED LED -Charging |
Duration Time | >3HRS |
Construction | Fire-Retardant ABS Casing and Plate;PS diffuser |
Installation | Wall Surface mounted;Ceiling Surface mounted |
IP Rate | IP20 |
Weight | 0.683KG |
Operating Temperature | -10°C to 60°C |
Product Size | 345x118x80mm(LxWxH), Tolerance:±0.03mm |
Product Shows
Package
- 1 Piece in 1 Inner Carton
- 10 Pieces in 1 Master Carton
- Master Carton Size: 45X37X26 CM
- G.W:8.45KG
- N.W:6.83KG
Delivery Time
- 20~35 days on receipt of your payment
1.Any Inquiries will be replied within 24 hours.
2. Professional manufacturer.
3. OEM/ODM available:
1)Silk print logo on the product
4. High quality, fashion designs, reasonable & competitive price, fast lead time.
5. After-sale service
1)All products will be strictly quality checked before packing.
2)All products will be well packed before shipping.
3)All products and most of accessories have 3 year warranty.
Accessories Lead-acid battery is 6 month and Fluorescent T5 tube is 3 month.
6. Payment
You can pay for the order via: TT, Western Union, MoneyGram, L/C
1. Established in 2008, Hangzhou, China
2. Four Production Lines, workshop occupies 1100m2, warehours occupies 1100m2
3.Exhibitions & Fairs
4.Certificates
- SGS Factory
- CE & Rohs
- IP65
5.Equipments
- Intergrating Spheres: to measure brightness(luminous flux)
- Wave Soldering Machine: to solder PCBs
- Aging Test Board: to test products performance and select good products
- Constant Temperature Humidity Chamber: to simulate different environment condition and test products
1. What is the main differences of Fluorescent lamp and LED?
Main difference is power consumption and life span.
For same brightness, the power consumption of fluorescent lamps 2 to 3 times that of LED lamps.
The life span of LED lamps 10 times that of fluorescent lamps.
2. How about the life span of LED Lamps.
Under normal condition, it is about 5000h.
3. Is the company a trading company or a factory?
The company is a factory, and we do export by ourselves.
4. ODM or OEM is acceptable?
Yes, both of them is acceptable.
5. How about the delivery time?
For normal products, the delivery time is 1 month for MOQ.
For customized products, the delivery time will be different accordingly.
6.What can be customized?
Battery
Package
Emergency time. Other requirements from cutomers. Of course, the engineers will evaluate first.