Homepage|Business Center|Save the Page|Get the App
普通会员

Zhongshan Junrui Lighting Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Pendent light fixtures Solar Home Lighting Kit with 3 LED Handy bulbs and multifunctional charging cable
Pendent light fixtures Solar Home Lighting Kit with 3 LED Handy bulbs and multifunctional charging cable
Click on the image to view the original image
Product: views:47Pendent light fixtures Solar Home Lighting Kit with 3 LED Handy bulbs and multifunctional charging cable 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-18 15:29
  Negotiated
Product Details
Product Description
Product Details
Title
Hanging solar lights outdoor round column home light home lighting outdoor QP03
Model No
JR-CGY/3
Housing Material
PC
Body Color
BLUE/White/RED(Any color can make)
Solar Panel
12W/15W/20W
Battery
2600/4400/5200mah Lithium battery
Controller
Switch
Working Time
6-8hours
LED Source
3*3W high brightness LED
LED colors
white/warm white 
Average operation time
6-8 hrs/day
Average Life (hrs)
35000-50000
Temperature Range
-20 -- +60 Degree
Charging time
4 hours
Warranty
2 Years

Product Advantages:

1:Automatic Sensor Function.2:Super Bright LED.3:Free Green Energy.4:100% Waterproof.5:Easy Assemble and Install.

Application&Project

Applications:

residential quarters, city parks, tourist attractions, plaza, outdoor terrace, garden villas, green square, resorts, golf courses, corporate factory green lighting and landscaping, residential housing,city roads.

Wisdom Project 1:


Wisdom Project 2:


Wisdom Project 3:



Certifications

Certifications:

Wisdom Solar have CE,EMC,LVD certifications.Applicable to the following models:JR-B007 Series, JR-2602 Series, JR-B008 Series, JR-CP02 Series, JR-3018 Series, JR-CP46, JR-CP83, JR-CP80, JR-CP95, JR-B002, JR-B009, JR-2713, JR-CP96, JR-CP10, JR-CP11, JR-B005, JB-006, JR-2012, JR-CP12, JR-3210, JR-3201, JR-PB001, JR-PB002, JR-PB006, JR-PB008.and It have the ISO9001certification.All our products are guaranteed for 3 years.

Payment & Assurance
Payment Term
T/T
30% T/T in advance, paid the balance before shipment or against copy of B/L
L/C
L/C amount above 50,000 usd, we can accept L/C at sigh
West Union
Amount lower than 5000usd
paypal
30% T/T in advance, paid the balance before shipment
Trade Assurance
We welcome use Trade Assurance, you'll enjoy:

100% product quality protection
100% on-time shipment protection
100% payment protection for your covered amount
Delivery Time
15~30days after receiving payment for one container
Packing & Delivery
Packing
Foamed plastic inside to protect solar panel, pole, base from scar, 5mm solid paper box
By sea
Delivery from Guangzhou,Shenzhen,Zhongshan seaport
By air
Departure from Guangzhou Baiyun Airport
By express
By TNT/DHL
FAQ

Q1. Can I have a sample order for led light?

A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q2. What about the lead time?
A:Sample needs 5-10 days, mass production time depends on the order quantity.

Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available

Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.

Q6. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

Q7: Do you offer guarantee for the products?
A: Yes, we offer 3-5 years warranty to our products.


询价单
total0items  Comments