- Applicable Industries:
- Hotels, Farms, Restaurant, Home Use, Construction works
- Place of Origin:
- Hebei, China
- Brand Name:
- LanYu
- Material:
- Pallet, FRP/GRP/SMC pannels
- Weight:
- /
- Size:
- As your requirement
- Power:
- /
- After-sales Service Provided:
- Video technical support, Online support
- Warranty:
- 1 Year
- Item:
- grp frp water tank tanzania frp water tank 100m3
- Panel size:
- 1*1m, 1*0.5m, 0.5*0.5m
- Panel thickness:
- 5mm-24mm
- Accessories:
- Hot galvanized / stainless steel
- Capacity:
- 1 - 1000m3
- Process technique:
- Sheet molding compound
- Bottom case:
- C-channel steel
- Foundation:
- concrete case
- Working time:
- 20 years
- Supply Ability:
- 1800 Cubic Meter/Cubic Meters per Month quick delivery of frp water tank 100m3
- Packaging Details
- grp frp water tank tanzania are always packed in pallet or wooden carton
- Port
- Tianjin
- Picture Example:
- Lead Time:
Quantity(Sets) 1 - 1 2 - 3 >3 Est. Time(days) 15 20 To be negotiated
grp frp water tank tanzania frp water tank 100m3
What is SMC GRP FRP water tank
1. Sheet Molding Compound is a fiber-reinforced material, which consists primarily of a thermosetting resin glass fiber.
2. SMC is a high tech material that is used in the manufacturing process in most of our products ranges.
3. The advantage of SMC include, high impact compressive, flexural and tensile strength along with temperature stability.
4. SMC has low profile, low shrink for excellent surface appearance and painting.it's color pigmentable and has excellent chemical and electrical resistance varied to provide insulation, conductivity or anti static properties.
FRP Water Tank is made of Fiberglass reinforced plastics which is divided in FRP Modular type and SMC combination
type. The major advantage is light weight, anti-rusted, non-leakage, long durable time and easy to clean. It is widely used in hotel, school, hospital and coal mine enterprise.
FIBERGLASS WATER TANK STEP-BY-STEP ASSEMBLY:
Step 2. Align GRP panel to be pre-assembled.
Step 3. Place rubber sealant from ready-to-use roll between panels.
Step 4. Conect panels with bolts and nuts.
Step 5. Position bottom panel sections,and finish up base of tank .
Step 6. Position three sides of the tank .
Step 7: Position and fix roof panels and if required ,roof support pipes and plates.
Step 8: Install reinforcement if required.
Step 9: Close up the tank with the fourth side .
Step 10.Finish the internal or external reinforcement .
Step 11.fill and test .