Homepage|Business Center|Save the Page|Get the App
普通会员

Luohe Hilight Technology Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Shenzhen factory new type tower crane projection lamp SMD LED 200W high pole flood light
Shenzhen factory new type tower crane projection lamp SMD LED 200W high pole flood light
Click on the image to view the original image
Product: views:29Shenzhen factory new type tower crane projection lamp SMD LED 200W high pole flood light 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2021-01-06 11:20
  Negotiated
Product Details

Shenzhen factory new type tower crane projection lamp SMD LED 200W high pole flood light

 

Technical data:

Item name  IP65 200W SMD LED flood light
Power  200W
LED Quantity 54 pcs
Input Voltage AC 85~305V   50/60Hz
Color Temperature 2700-6500K
Light effect 130LM/W
Lumen 26,000LM
CRI Ra.≥80
IP 65
Viewing angle 10°,20°,30°,60°
Materials Aluminum
Operating Temp. -40ºC to +60ºC
Applications Stadium, football field, airport, square, etc.
Qty / CTN 1PC
N.W. 7.2KG / PC
G.W. 8.2KG / PC
Lamp dimensions Φ369 × 345mm
Carton size 46 ×46 ×34cm
Lifetime 50,000 hours
Quality warranty 5 years
Certificates CE,ROHS, EMC, LVD, ISO9001

 

Features:
1.High efficiency MEANWELL Driver,ELG series.
2.Imported original LED Chip.
3.Aluminum lamp housing with built-in copper heat pipe,excellent structure for heat dissipation.
4.The surface of lamp housing is anti-corrosion and electrophoresis processed,can be used at seaside.
5.Dust-proof,moisture proof and waterproof ,IP65 rated.
6.Excellent optics design,higher luminous efficiency.
7.Compare to traditional lamps can save energy 60%-70%.
8.5 years warranty.

 

Product details:

 

Technical characteristics:
The efficient pure copper heat pipe contacts directly with the heat source in zero distance,which exerts the performance of the heat pipe to the best with a heat transfer rate over 200 times of the aluminum radiator.


Installation and packaging:

Application:
It can be widely used in stadiums, football fields, airports, squares, playgrounds, construction sites, buildings, etc.

 

Installation instructions:

1. Non-specialist electricians please do not repair or modify this product without authorization;

2. Please turn off the power before installation;

3. Before installation, please check whether the voltage marked on the lamp is consistent with the input voltage to be connected;

4. In order to ensure the service life of the product, please do not use it in a place with strong acid mist;

5. Pay attention to shock protection during installation and transportation;

6. Before installation, ensure that the installation position can withstand 10 times the weight of the product, and install it in a flat place without vibration, no swing, no fire hazard;

7. If the lamp fails, please place the lamp in one place and send it back to the company for inspection and repair.

8. If the lamp body or wire is damaged, please stop using it immediately.


Our workshop:
We have 6 production lines at production department, including assembling, inspection and aging test lines.
Production ability: 5-7 days for 100pcs LED high bay light, and 15-16 working days for 500pcs LED high bay light at common requirements.

 

Packing & Aging test:
Each Lamp must pass 24 hours aging test and high voltage (2KV, 4KV, 6KV) surge test before we make packing and make delivery. 

 

Our Services:
1. For all your inquires about us or our products, we will reply you in detail within 24 hours;
2. Excellent design team with designers of more than 12 years experience, can offer professional advice for practical application;
3.  5000,000 pcs light source annual production capacity, the products export to EU market, American market, Russia, Kazakhstan, Australia, South Africa, Zimbabwe, Vietnam, etc;
4. Good OEM & ODM business ability, 6 production lines meet your shipping requirement;
5. Export port Shenzhen, Hongkong or Shanghai;
6. Discount available for bulk order;
7. High quality component and material,Filips, Bridgelux, 3030SMD, 5050SMD, Epistar LED chips, MW / Sosen / HT/ TUV SAA CE listed driver etc, depend on your needs.

Payment Terms:
TT Bank Transfer, support 30% deposit and 70% before delivery;
PayPal, western union, Alipay etc.
NO O/A.

Delivery time:
Samples and less than 50pcs in 3-5 working days;
100pcs in 5-7 working days;
500pcs in 15-16 working days. 

About Shipping:
Samples sent by DHL, TNT, FedEX, UPS, SF Express, Aramex etc. Door to door, you may pay customs tax depends on your customs policy.
By air or by sea for bulky orders available.

FAQ:
1. Are you factory supplier?
Yes, we are manufacturer of LED lamps since 2008 and we have our own factory, supply duable super quality items and reliable after-sale service.

2. Do you supply OEM or ODM?
Yes, we can supply OEM and ODM serice with favorable price and we have our own mould workshop, your brand and logo can be printed on the items.

3. How long will it spend for our orders to be sent out?
It takes 3-5 days for samples at common requirements, and 15-16 days for big order such as 500pcs LED high bay light.

4. What about your after-sales servie and warranty policy?
We offer 5 years warranty for this LED high bay flood light, by supplying you the lamp parts or new replacements for free during the warranty period for any non-human defective lamps. 

询价单
total0items  Comments