Welcome to Lonyung Led Lighting
ETL Listed Jewellery Cabinet Led Lighting with Multi Length
Technical Specifications | |
Input Voltage | AC100-277V 50/60Hz |
Total harmonic distortion | THD<19% |
Power Factor | PF>0.95 |
Efficiency | 150LM/W |
Color Index | Ra>82 |
Lumen maintenance @6000h | >80% |
Operation Temperature | -15°C ~ +50°C |
UGR | <19 |
Life Span | 50,000 hours |
CCT | 3000K,4000K,5000K,6000K |
Material | Aluminum + PC |
Feature
1. OSimplest installation and electrical connection, Plug and plug
2. High brightness, Excellent Lumen output up to 120lm/w
3. Complete package with everything you need to install
Model | Size | Power | CCT | CRI | Beam Angle | Package |
LY-T5FL300-4W | 1ft | 4W |
3000K 4000K 5000K 6000K |
>80 | 120 | 490*200*230 (mm) 20pcs/ctn |
LY-T5FL600-7W | 2ft | 7W | 780*200*230 (mm) 20pcs/ctn | |||
LY-T5FL900-12W | 3ft | 12W | 1085*200*230 (mm) 20pcs/ctn | |||
LY-T5FL1200-15W | 4ft | 15W | 1390*200*230 (mm) 20pcs/ctn | |||
LY-T5FL1200-20W | 4ft | 20W | 1390*200*230 (mm) 20pcs/ctn |
Options
1. Fuctions: Standard Version / CCT Adjustable Version / ON-OFF Swith
2. Connection Way: Lead in wire / M-F Connection / Power cord with Plug
3. Installation Type : Standard Clip / Magnetic Clip / Suspending Kits
4. Cover: Milky / Clear
Linkable T8 Led Linear Integrated Tube Light, Cilck Picture and get more information it.
♥ Reliability
1. As long as 72h aging test with automatic switching before each shipment.
2. 100% vibratility test will make sure the fastness of the assembling.
3. 100% resist voltage test of AC85-305v makes sure those tubes compatible for both 120v and 277v.
4. More than 95% lumen maintenance based on the 6000h LM-80-08 test
5. -40°C to 50°C(-40°F to 122°F) extreme environment compliant.
♥ Shipping options
- By express: Such as DHL,UPS, TNT, FEDEX etc. The dispatch time is about 3-7 working days.
- We will search for an economical shipping company to transport the goods safely.
- Air Freight: When you order more than 100kg which will be more economical than express.
- Agent designated by client: Please tell us the contact details of your shipping agent/forwarder
♥ Trade Terms
- Payment: T/T , 30% deposits before production, 70% balance to be paid before delivery.
- Production lead time for 100~500pcs: 7days, 500~1000pcs:10days
- Sample can be delivered in 3 days
- Shipping port: ZHONGSHAN/SHENZHEN
- Discounts are offered based on order quantities
♥ Any questions & enquiries, please do not hesitate to contact with us directly!