10W-400W LED Dimmable PWM Dimmer fluorescent LED lamps 0/1-10v dimming driver push dimmer
Specification:
Item no | MSD-0/10V-DIM-CV-10W |
Input voltage | AC85-265V |
Output voltage | 12V or 24V |
Output current | 0.83A or 0.42A |
PF | >0.98 |
EFF | >89% |
Low Ripple wave | <3% |
Low temperature resistance | -45℃ |
IC/MOSFET | Infinon/Fairchild |
Certificates | CE,RoHS,TUV,SAA,ETL |
Warranty | 5 years |
1).Full input voltage:85~265VAC. |
2).PF>0.98 THD<8% Ripple<3% Efficiency>90% |
3).Efficiency>90% |
4).Protection:short circuit,over voltage,over temperature. |
5).4000VAC high voltage protection |
6).Load required:0-100% |
7).Dimming way: 0/1-10VDC,PWM,potentionmeter.Dimming range:0-100% |
8).NCC/Rubycon capacitor ,5 years warranty. |
9).OEM available,NO MOQ |
10).Certificates:SAA,TUV,ETL,CE |
Suitable for dimmable LED lights ,including LED electronic display screen, LED street lights, LED tunnel lights, LED bridge lights, LED panel lights, LED ceiling lights, moving sign application, etc
Samples checking: sending by Express (DHL / UPS / FEDEX / TNT/EMS)
Bulk production: sending out by cargo shipping / air freight / Express
1. Q: Are you a factory or trading company?
A: We are a factory. research and development and producing LED Driver.
2. Q: where is your factory located? How can I visit there?
A: 5F building G,zhongnangang industrial city,Liguang community,Guanlan,Longhua new district,Shenzhen,Guangdong,China.
Warmly welcome to visit us!
3. Q: How does your factory do regarding quality control?
A: " Quality Culture", incoming quality control
4. Q:What is your main product line?
A:
(1) DALI LED driver series and accessories. (10-250W) We are one of DALI Member.
(2) 0/1-10V PWM Dimmable LED Driver. (10-300W)
(3) High PFC IP67 LED Driver. (10-400W)
(4) Plastic cover Non Dimmable LED Driver. (10-60W)
(5) Thin Slim Plastic Cover Non Dimmable LED Driver. (10-45W)
(6) Triac CV Dimmable LED Driver. (5-200W)
5.Payment Term:
T/T;Western Union;Paypal etc can be accepted
6.Delivery:
3-5 days for sample order
7-15 days for mass production
20-30 days for large order