Homepage|Business Center|Save the Page|Get the App
普通会员

Jiangmen Mingwei Electric Appliance Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > China Supply SMD IP65 100 Watt LED Floodlight 2000 Lumen 20 Watt LED Flood Light Sports Outdoor 30W 50W 150W LED Flood Light
China Supply SMD IP65 100 Watt LED Floodlight 2000 Lumen 20 Watt LED Flood Light Sports Outdoor 30W 50W 150W LED Flood Light
Click on the image to view the original image
Product: views:10China Supply SMD IP65 100 Watt LED Floodlight 2000 Lumen 20 Watt LED Flood Light Sports Outdoor 30W 50W 150W LED Flood Light 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-17 16:01
  Negotiated
Product Details

China Supply SMD IP65 100 Watt LED Floodlight 2000 Lumen 20 Watt LED Flood Light Sports Outdoor 30W 50W 150W LED Flood Light

Product Description

 

Wattage20W30W50W100W150W
Light sourceSMD 2835 LED Floodlight
Lamp Luminous Efficiency(lm/w)100 lm/w
Lamp Luminous Flux(lm)2000LM3000LM5000LM10000LM15000LM
Color Temperature(CCT)2800-3000K,4000-4500K,6000-6500K,7000-7500K
CRI (Ra>)80
Input Voltage(V)AC100-240V
Housing MatrialDie-cast Aluminum LED Floodlight
DriverIC,Isolated
Driver efficiency≥0.9%
Power Factory(PF)≥0.95
Working Temperature(℃)—40~45℃
IP RatinIP65
Angle Beam (Degree)130
Irradiation distance (Meter)3451218

Irradiation Area

(Square meter)

7-89-1013-1825-3045-50
Product Size(mm)135*175*43180*220*46280*230*60350*290*70400*320*80
CertificateCE, ROHS, EMC, LVD
Warranty(Years)5 Years
 

Hot Products

Company Information
Packaging & Shipping
FAQ

1. Are you manufacturer?

Yes,Lasom Lighting team have over 30 experience in lighting business.

 

2. Can you produce according to the samples or drawings? 

Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures

 

3. What is the lead time?  

It usually takes 25 to 35 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

 

4. What is your terms of delivery?     

We accept EXW,FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.

 

5. How to solve the quality problems after sales?   

Take photos of the problems and send to us. We will make a satisfied solution for you within 24 hours after we confirm the problems.

 

6. Do you have any MOQ limit for led light order?

 Low MOQ, 1pc for sample checking is available.

Contact Us

询价单
total0items  Comments