Homepage|Business Center|Save the Page|Get the App
普通会员

Ningbo Stranger Outdoor Products Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > 4LED/8LED Waterproof Solar Powered Disk Lights Under Ground Lamp Outdoor Waterproof
4LED/8LED Waterproof Solar Powered Disk Lights Under Ground Lamp Outdoor Waterproof
Click on the image to view the original image
Product: views:24LED/8LED Waterproof Solar Powered Disk Lights Under Ground Lamp Outdoor Waterproof 
Branch: STRANGER
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 16:29
  Negotiated
Product Details
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
STRANGER
Model Number:
ST-SG06
Product name:
solar ground lights
Material:
Stainless steel+ABS+PP
Battery:
1x1.2V 200mAhNi-MH rechargeable battery
Charging time:
4-6 hours
Working time:
6-10 hours
Operation:
Outdoor
Solar Panel:
2V 80mA
Mode:
ON/OFF+Sensor
Led source:
8leds
Packing:
4pcs/set
Light Type:
Solar
Rated Power:
2
Voltage:
3.7
Protection Level:
IP44
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month Product name: 8led disk light
Packaging & Delivery
Packaging Details
8led disk lightpacking:blister card/color box
Port
NingBo
Lead Time:
25-30 days
complete profile
   
4LED/8LED  Waterproof Solar Powered Disk Lights  Under Ground Lamp Outdoor Waterproof

Product name

solar ground lights
Battery1x1.2V 200mAh  Ni-MH rechargeable battery
Working time6-10 hours
Charging time4-6 hours
Material Stainless steel+ABS+PP
Operation outdoor
Led bulbs

8LEDs

Size

11.5x11.5x13.5cm(131.8g)

Weight583g

Advantages

 

  

Which payment term can we accept?  
T/T or L/C ,
1. On T/T term,30% deposit payment is required in advance, 70%balance payment T/T before shipment
2. On L/C term,100% irrevocable L/C at sight ,without ‘soft clauses’ can be accepted.  

How long will the price be valid?  
The price valid time is 90 days, we only adjust our price based on two situations:
1.The rate of USD:RMB varies significantly
2.The cost of the machine, because of the increasing labor cost and raw material cost.

What logistics way we can work for shipment?
Normally, the shipment will go by sea, if buyers have other requirements ,we will do the shipment according customer’s requirement

Click here to go back to the home page  

询价单
total0items  Comments