- Item Type:
- Ceiling Lights
- Light Source:
- LED, 144pcs SMD 2835
- Install Style:
- Surface Mounted
- Input Voltage(V):
- AC220-240V
- Lamp Luminous Flux(lm):
- 1700
- CRI (Ra>):
- 80
- Working Temperature(℃):
- -10 - 40
- Working Lifetime(Hour):
- 30000
- Lamp Body Material:
- PC
- IP Rating:
- IP54
- Certification:
- CE, RoHS
- Place of Origin:
- Shanghai, China
- Brand Name:
- BAIYI
- Model Number:
- BY-Z1024E
- Application:
- office
- Input:
- AC220-240V/50Hz/0.18A
- Emergency Power:
- 2.5W
- Luminance Flux:
- 1700 Lumens
- Emergency Luminance Flux:
- 300 Lumens
- CCT:
- 6500K
- Battery:
- Lithium LiFePO 3.2V 1.5Ah
- Emergency Duration:
- 3 Hours
- Degree of Protection:
- IP 54
- Case Materials:
- Poly Carbonate
Packaging & Delivery
- Selling Units:
- Single item
- Single package size:
- 38X38X11 cm
- Single gross weight:
- 2.4 kg
- Package Type:
- Inner box+ outer carton
- Lead Time:
Quantity(Piece) 1 - 50 51 - 50000 >50000 Est. Time(days) 15 45 To be negotiated
Model No.BY-Z1015E BY-Z1018E BY-Z1024E | Emergency lighting in homes, shopping malls,hospitals, schools, buildings. Emergency lighting is generally used in industrial and civilian buildings to cope with sudden accidental power outages. After power outages, lighting is provided for evacuation of personnel. |
| |||
Product Name: | LED Emergency Ceiling Light | ||
Model NO.: | BY-Z1015E | BY-Z1018E | BY-Z1024E |
Input: | AC220-240V/50Hz/0.11-0.14A | AC220-240V/50Hz/0.15A | AC220-240V/50Hz/0.18A |
Light Source: | 84pcs SMD 2835 | 96pcs SMD 2835 | 144pcs SMD 2835 |
Input Power: | 15W | 18W | 24W |
Emergency Power: | 1.5W | 1.8W | 2.5W |
Luminous Flux: | ≥900LM | ≥1200LM | ≥1700LM |
Emergency Luminous Flux: | ≥250LM | ≥280LM | ≥300LM |
CCT: | 6500K | 6500K | 6500K |
Battery: | LFP 3.2V/1.5Ah | LFP 9.6V/1.5Ah | LFP 9.6V/1.5Ah |
Emergency Duration: | ≥3 Hours | ≥3 Hours | ≥3 Hours |
Degree of Protection: | IP65 | IP65 | IP65 |
Charge Time: | ≤24 Hours | ≤24 Hours | ≤24 Hours |
Operation Mode: | Maintained/Non-Maintained | Maintained/Non-Maintained | Maintained/Non-Maintained |
Materials: | Poly Carbonate | Poly Carbonate | Poly Carbonate |
Dimension: | 220mmx220mmx61mm | 280mmx280mmx61mm | 330mmx330mmx61mm |
Weight: | 0.8KG | 1.0KG | 1.2KG |
About us
Baiyi Lighting(Shanghai) Holdings Limited was founded in 2008 and is located in Qingpu District, Shanghai, China, 30 minutes drive from Hongqiao Airport. It is a high-tech enterprise specializing in the development, production, sales and service of LED emergency lighting, LED fire protection devices, LED high-efficiency drive power supply and other related products. Baiyi lighting existing factory building area: 22,585 square meters, sitting 13 production lines that can produce millions of LED lighting lamps and supporting power supply production capacity, but also has advanced domestic professional test equipment, reliability test equipment, optoelectronic laboratories and other professional R&D and test equipment. Our company"s products have passed the EU TUV CE certification, U.S. UL certification, national CQC, 3C certification, and exported to Europe,North America, Southeast Asia and other regions, and we also undertake OEM and ODM orders, welcome to contact with us for your needs of emergency related products.
Q: Are you factory? Can you manufacture the device as I wish?
A: We are factory and have export right can export directly,some trading company get goods from our factory. Our company has its own R & D team, OEM & ODM & OBM are available.
Q: When could I get the quotation?
A: We usually quote within 24 hours after we get your inquiry. If you are very urgent to get the price, please call us or tell us in your email, so that we would regard your inquiry priority.
Q: Do you accept small orders?
A: Pls fell free to contact us no matter how many products you want, we will try our best to get the best price for you.
Q: Do you accept sample order?
A: Yes, we accept sample orders, and price is also good.
Q: What is the lead time?
A: Sample time 1 - 7 days, will arrive in 3 - 7 working days. Mass production 15 - 40 days after receive the deposit, it depends on the amount of the orders.
Q: How should I pay for you if I place order to you?
A: Usually, the Payment terms Paypal, T/T, Visa, West Union could be accepted. 30% deposit in advance, 70% paid before the shipment.
Q: What delivery ways we can use?
A: We can deliver through ship and air or express, and will recommend the best way to our customers.
Q: How about the delivery cost and tax cost?
A: Delivery cost is depend on the way, destination and weight. And tax is depend on customer"s local customs.