Product Descreption
Item name | 3 step CCT change led panel light square/round recessed panel lamp |
Power | 3w/6w/9w/12w/18w/24w |
Product size | Dia85*hole70mm/Dia115*hole100mm/Dia145*hole130mm/Dia165*hole150mm/Dia210*hole195mm/Dia285*hole270mm |
Material | Aluminum |
Input voltage | AC170-250v |
Ra | >80 |
PF | >0.5 |
Lumen | 70lm/w |
MOQ | 500pcs |
Package | 1pc/white box |
Application
Company Introduction
Packing&Shipping
Recommend Products
FAQ
1. Where is your factory?
Our factory located in Ningbo City, Zhejiang Province.
2. Where is your main market?
We have experienced in exporting for more than 10 years and our market extends to Europe, America, Asia, Australia and Africa.
3. What is your main products?
We are manufacturer specialized in led indoor lighting ( led bulb, led ceiling lamp and led tube., ect) and led outdoor
lighting (led flood light, high bay light).
4. Do you accept OEM and can I apply my brand to your product?
Yes, we do OEM and we can produce goods with your brand.
5. How long is warranty of your products?
We offer 1 year / 2 years / 3 years / 5 years warranty for our products. It depends on product price and customer requirements.
6.How long can I get the sample and mass production order?
The lead time for sample is within 7 days and the lead time for mass production is usually 35-45 days.
2. Where is your main market?
We have experienced in exporting for more than 10 years and our market extends to Europe, America, Asia, Australia and Africa.
3. What is your main products?
We are manufacturer specialized in led indoor lighting ( led bulb, led ceiling lamp and led tube., ect) and led outdoor
lighting (led flood light, high bay light).
4. Do you accept OEM and can I apply my brand to your product?
Yes, we do OEM and we can produce goods with your brand.
5. How long is warranty of your products?
We offer 1 year / 2 years / 3 years / 5 years warranty for our products. It depends on product price and customer requirements.
6.How long can I get the sample and mass production order?
The lead time for sample is within 7 days and the lead time for mass production is usually 35-45 days.