3. Cooperation with cloud platform and can check the inverter status
Product Description
High Power
Max DC voltage 1100v, max power 125kw
High Efficiency
Max efficiency 99.04%, 3/4 channels MPPT
High Reliability
80k-125k smart air cooling, night PID module, compatible with bifacial PV modules
Lightning protection
Provide full range of lightning protection , reliable under/over voltage protection
Compact Structure
Easy for installation and maintenance
Friendly to environment
Provide clear and green energy ,Photovoltaic power generation, save electricity costs
Details Images
Model | BSM80K-BHV | BSM125K-BHV | ||||||||
DC Input | Max. DC Voltage | 1100V | ||||||||
MPPT Voltage Range | 250V ~ 1000V | |||||||||
Max. Input Current of Each MPPT | 39A/52A | 65A | ||||||||
Number of DC Inputs | 14 | 20 | ||||||||
MPPT Number | 4 | |||||||||
AC Output | Rated Output Powr | 80kW | 125kW | |||||||
Max. Active Power (cos0=1) | 88kW | 137.5kW | ||||||||
Rated Output Voltage | 500V (Three Phase) | |||||||||
Operating Voltage Range | 500V±10% | |||||||||
Rated Output Current | 92.4A | 144A | ||||||||
Max. Output Current | 101.6 A | 158.8A | ||||||||
Rated Grid Frequency | 50Hz/ 60Hz | |||||||||
Power Factor | 0.8 (Leading) -0.8 (Lagging) | |||||||||
THD | <3% | |||||||||
System Parameters | Max. Efficiency | 99.03% | 99.04% | |||||||
European Efficiency | 98.53% | 98.54% | ||||||||
Protection Level | IP65 | |||||||||
Operating Temperature Range | -25°C~+60°C | -40°C-+60°C | ||||||||
Cooling System | Smart Air Cooled | |||||||||
Standby Power Consumption | <5W | |||||||||
Topology Structure | Transformerless | |||||||||
Operating Altitude | 5000m (Derating above 4000m) | |||||||||
Display | LED Indicator +APP | |||||||||
Communication | RS485 /WiFi/GPRS | |||||||||
Certification | IEC62109 / IEC61000 / IEC62116 /IEC61727 / EN50S49 / CQC / CGC | |||||||||
Monitoring Equipment
3. Cooperation with cloud platform and can check the inverter status
Certifications
Our Project
12MW Dalian Roof-top PV project in China
Ukraine 15MW solar plant
CNNC 2.8MW PV project in Weihai, China
Roof-top PV project in Anhui Province, China
String photovoltaic project in Shandong Province, China
50 KW String inverter project in China
China 500 KW solar project
Payment
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | ||
FOB | |||||
CNF | 30% T/T in advance, paid the balance against copy of B/L | ||||
CIF | |||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||
West Union | Amount lower than 5000usd | ||||
Delivery Time | 7~10days after receiving payment for one container |
Gloable Exhibition