- Input Voltage(V):
- 220-240
- Lamp Luminous Flux(lm):
- 1300
- CRI (Ra>):
- 80
- Working Temperature(℃):
- -40 - 65
- Working Lifetime(Hour):
- 30000
- Lamp Body Material:
- Die-casting Aluminium
- IP Rating:
- IP65
- Certification:
- CE, RoHS
- Place of Origin:
- Zhejiang, China
- Brand Name:
- SOWELL
- Light Source:
- LED
- LED type:
- round IP65 LED bulkhead lights
- Wattage:
- 15W
- Voltage:
- 220-240V
- Lumen:
- 1300LM
- Color Temperature:
- pure/warm white
- CRI:
- >80
- life time:
- 30000hours
- Material:
- Die-casting Aluminium and PC Cover
- waterproof:
- IP65
- lamp size:
- 173mm*173mm*68mm
- Item Type:
- Panel Lights
- Color Temperature(CCT):
- pure/warm white
- LED Light Source:
- 5630SMD
- Warranty(Years):
- 2
- Lamp Luminous Efficiency(lm/w):
- 87
- Supply Ability:
- 100000 Piece/Pieces per Month LED bulkhead lights 15W round IP65
- Packaging Details
- colorboxes or customized.
- Port
- Ningbo
- Lead Time:
Quantity(Pieces) 1 - 30000 >30000 Est. Time(days) 35 To be negotiated
220-240V15W round IP65 LED bulkhead lights
Code | SW-LEDP10 |
Type | round LED bulkhead lights 15W |
Voltage | 220-240V |
Wattage | 15W |
LED Q"TY | 5630SMD |
Lumen | 1300LM |
Color Temperature | 3000K-7000K |
CRI | >80 |
Power Factor | >0.5 |
Material | Die-casting Aluminium and PC Cover |
Life time | 30000Hours |
Water proof | IP65 |
Certification | CE/RoHS/SASO |
Q: 1. Can I have a sample order for led light LED bulkhead lights 15W round IP65? |
Q: 2. What about the lead time? |
Q: 3. Do you have any MOQ limit for led light LED bulkhead lights 15W round IP65 order? |
Q: 4. How do you ship the goods and how long does it take to arrive? |
Q: 5. How to proceed an order for led light LED bulkhead lights 15W round IP65? Secondly We quote according to your requirements or our suggestions. Thirdly customer confirms the samples and places deposit for formal order. Fourthly We arrange the production. |
Q: 6. Is it OK to print my logo on led light LED bulkhead lights 15W round IP65 product? |
Q 7: Do you offer guarantee for the products? |
Q 8: How to deal with the faulty? |
1. Welcome OEM.
You can use your own brand or ours. If you use our brand, our professional design team will help you design the packing
2.Quality control research team
1. Before the order can be confirmed finally,we would strictly check the material , dimension of the sample step by step
2. We salesman ,also as a order follower,would trace every phase of production from the beginning.
3. We have a QC team ,every product would be checked by them before packed
100% of the lamps will be tested and keep lighting for 24 hours to test its quality reliability, and we will also test its temperature after 24 hours" lighting. Then after it is cool we again test 100% of the lamps to see if it still work well. Each lamp should pass all these QC procedures before packing.
4. We would try our best to help clients solve problems when they occurred
3. Quality control Professional import inspection equipment
1. Load test(Electrical spec. test)
2. Aging test
3. High- voltage test
4. Grounding conduction test
5. Install test.
6.Adhesion test.
3.Certification: CE, ROHS, INTERTEK, ITS, CQC, etc.
Certificatons: