Homepage|Business Center|Save the Page|Get the App
普通会员

Ningbo Sowell Light Industry Trade Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > flood light led outdoor 20W COB
flood light led outdoor 20W COB
Click on the image to view the original image
Product: views:2flood light led outdoor 20W COB 
Branch: SOWELL
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 15:06
  Negotiated
Product Details
Overview
Quick Details
Input Voltage(V):
110/230
CRI (Ra>):
80
Beam Angle(°):
120
Working Lifetime(Hour):
30000
Lamp Body Material:
Aluminum
IP Rating:
IP65
Certification:
CE, GS, RoHS
Place of Origin:
Zhejiang, China
Brand Name:
SOWELL
Model Number:
SW-LF004
Light Source:
LED
Lamp Luminous Flux(lm):
2000
Working Temperature(℃):
-20 - 40
Voltage:
110V/230V
Wattage:
20W
Lumen:
2000LM
LED Q'TY:
COB
Color Temperature:
2700K-7000K
water proof:
IP65
Lamp size:
140*178*150mm
Beam Angle:
120°
power factor:
>0.9
Material:
Aluminum body
Item Type:
Flood Lights
LED Light Source:
COB
Lamp Power(W):
20
Lamp Luminous Efficiency(lm/w):
100
Color Temperature(CCT):
2700K-7000K
Supply Ability
Supply Ability:
10000 Piece/Pieces per Month flood light led outdoor 20W COB
Packaging & Delivery
Packaging Details
colorbox or customized.
Port
Ningbo
Lead Time:
30-35days

flood light led outdoor 20W COB

 

110V/230V 20W 2000lumen Aluminum body 2700K-7000K CE GS COB outdoor LED flood lamps

Product Description

 

 

flood light led outdoor 20W COB

 

CodeSW-LF04
Voltage110/230V
Wattage20W
Packing16pcs/0.045m³/12kg
Lumen2000LM
Color Temperature2700K-7000K
Power Factor>0.9
MaterialAluminum
Life time30000Hours
Lamp size140*178*150mm
Viewing  Angle120°
CertificationCE GS 

 

 

 

 

Application

Application of led flood light :

 

1.  Street

2.  Park

3.  Factories

4.  Residential / Institution Buildings

5.  Schools, Colleges & Universities

6.  Hospitals

7.  Placing where need energy saving and high color rendering index lighting 

 

FAQ

 

Q: 1. Can I have a sample order for led light flood light led outdoor 20W COB?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

Q: 2. What about the lead time?
A:Sample needs 5-7 days, mass production time needs 1-2 weeks for order quantity more than 5000pcs.

Q: 3. Do you have any MOQ limit for led light flood light led outdoor 20W COB order?
A: Low MOQ, 1pc for sample checking is available

Q: 4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q: 5. How to proceed an order for led light flood light led outdoor 20W COB?
A: Firstly let us know your requirements or application.

    Secondly We quote according to your requirements or our suggestions.

    Thirdly customer confirms the samples and places deposit for formal order.

    Fourthly We arrange the production.

Q: 6. Is it OK to print my logo on led light flood light led outdoor 20W COB product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.

Q 7: Do you offer guarantee for the products?
   A: Yes, we offer 2-5 years warranty to our products.

Q 8: How to deal with the faulty?
   A: Firstly, Our products are produced in strict quality control system and the defective rate will be less than 0.2%.
       Secondly, during the guarantee period, we will send new lights with new order for small quantity. For defective batch products, we will repair them and resend them to you or we can discuss the solution including re-call according to real situation.

Related Products
Quality Control

 

1. Welcome OEM.

You can use your own brand or ours. If you use our brand, our professional design team will help you design the packing

 

2.Quality control.

1)Before the order can be confirmed finally,we would strictly check the material , dimension of the sample step by step

2)We salesman ,also as a order follower,would trace every phase of production from the beginning.

3)We have a QC team ,every product would be checked by them before packed

100% of the lamps will be tested and keep lighting for 24 hours to test its quality reliability, and we will also test its temperature after 24 hours" lighting. Then after it is cool we again test 100% of the lamps to see if it still work well. Each lamp should pass all these QC procedures before packing.

4)We would try our best to help clients solve  problems when they occurred

 

3. cob led track light Quality control

We have professional import inspection equipment, research team.

1. Load test(Electrical spec. test)

2. Aging test

3. High- voltage test

4. Grounding conduction test

5. Install test.

6.Adhesion test.

 

3.Certification: CE, ROHS, INTERTEK, ITS, CQC, etc.

   Certificatons:                                                                             

 

Payment

 

  1. Payment: T/T, Western Union or Paypal, etc

  2. Delivery time:  If new make samples, 5-7days after confirmed;

                                 If exist samples, 1-2 working day;

                                 If bulk production, usually 35days after order confirmed.

  3. Delivery address: Ningbo, China

  4. Transportation: Air Express (EMS, DHL, UPS, ARAMEX),

                                  Sea Express through our forwarder or client"s forwarder.

  5. Support for custom products (including sticking labels, size, color, etc) cost extra

 

 

询价单
total0items  Comments