Homepage|Business Center|Save the Page|Get the App
普通会员

Shenzhen Sunwind Lighting Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Sunwind manufacturing USA standard 200W,300W,500W battery UPS
Sunwind manufacturing USA standard 200W,300W,500W battery UPS
Click on the image to view the original image
Product: views:3Sunwind manufacturing USA standard 200W,300W,500W battery UPS 
Branch: SUNWIND
Type: Standby
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 19:53
  Negotiated
Product Details
Overview
Quick Details
Place of Origin:
CHINA
Brand Name:
SUNWIND
Model Number:
UPS90100500
Phase:
Single Phase
Protection:
Overcurrent
Weight:
3.5KGS
Output Voltage:
AC110V/120V/60HZ
Type:
Standby
Application:
Telecommunications
LITHIUM:
500W
Supply Ability
Supply Ability:
1000000 Set/Sets per Week
Packaging & Delivery
Packaging Details
PAPER CARTON PACKAGE SUITABLE FOR THE AIR/SEA/AIR TRANSPORTATIONS.
Port
SHENZHEN
Lead Time:
Quantity(Sets)1 - 1000 >1000
Est. Time(days)15To be negotiated

Sunwind manufacturing USA standard 200W,300W,500W battery UPS

 

  
USA 200W UPS                         Australia&New Zealan UPS      Japanese 200W UPS  

 

 

 

Model

UPS90100500

Capacity

12V 26Ah(288WH)

AC output

Rated power 500W MAX1000W

AC input

AC90V-240V 50/60HZ

Output voltage

AC110V/120V 60HZ 220V/230V/240V 50HZ

Output current

DC 12V/ 8A (MAX 1OA)

USB 5V/6.2A  automatic identification     

Solar power

18V/ 20-100W

Output wave

Correction wave

Overload

After overload, AC output will be cut off, indicator turn red,load cutoff,restart recovery

Short circuit

After short circuuit, AC output will be cut off, load cut off, restart recovery

Cycle life

more than 500 cycles

weight

N.W. 1.5kg  G.W. 2.0kg

Size

290*110*135mm 

Color

Aluminium alloy body+black shell(ABS/PC) color can be customized

 

Charging time:AC110V charge about 4 hours

Working temperature:-20℃~60℃

Working hours(for your reference only)

laptop(30W):about 5 times

Lcd desktop computer(100W): about one hour and a half

Electric fan(50W): about 3 hours

Lcd tv(80W):about 2 hours

Camera(10W):about 15 hours

 

 

5. Basic function (electrical)test

Current voltage tester

Power tester

Oscilloscope

AC/DC input test

AC/DC output test

Manual test sensitivity of main switch

 

6. Confidence test

Continous working time: 12 hours

Average no-trouble time:continous working 12 hours, finish discharge, then recharg, repeat two more times.

Salt spray test: 8 hours

Drop test: stand alone 1m, whole carton 0.5 meter

 

 

6.1 High temperature high voltage and shock test

Testing method:

1. Put 3 pcs ups power supply into a room of temperature 60℃.

2. Plug in, turn on AC/DC output, testing 24 hours and observe the ups power supply whether have the phenomenon of damage or heating out of shape.

3. Function test: plug in then add load, in this situation go ahead shock test. Test setup: AC/DC input output, test 5 times. Test requirement: A. After high temperature and high voltage test, the ups power supply can not have the phenomenon of take off the lacquer in the surface,fade,cracking,material deformation and so on.

B.After shock test, the ups power supply can nhot happen the phenomenon of leakage and AC/DC abnormal input output

 

6.Low temperature low voltage and shock test

Testing method:

1. Put 3 pcs ups power supply into a room of temperature -15℃.

2.Plug in, turn on AC/DC output, testing 24 hours and observe the ups power supply whether have phenomenon of damage or heating out of shape.

3.Function test: plug in then add load, in this situation go ahead shock test. Test setup: AC/DC input output, test 5 times. Test requirement: A. After high temperature and high voltage test, the ups power supply can not have the phenomenon of take off the lacquer in the surface,fade,cracking,material deformation and so on.

B.After shock test, the ups power supply can nhot happen the phenomenon of leakage and AC/DC abnormal input output

 

 

6 .3 Normal temperature normal voltage and shock test

Testing method:

1. Put 3 pcs ups power supply into a room of temperature -15℃.

2.Plug in, turn on AC/DC output, testing 24 hours and observe the ups power supply whether have phenomenon of damage or heating out of shape.

3.Function test: plug in then add load, in this situation go ahead shock test. Test setup: AC/DC input output, test 5 times. Test requirement: A. After high temperature and high voltage test, the ups power supply can not have the phenomenon of take off the lacquer in the surface,fade,cracking,material deformation and so on.

B.After shock test, power supply, there should be no leakage, AC/DC input and output and other abnormal phenomena.

 

 

6.4 Temperature cycle test  

Testing method:

1. Put 3 pcs of ups power supply into a test box, the temperature rate of change of test box can be adjustment.
2. Test AC/DC input and output according to rated power supply input voltage.

3.Test box temperature change range from - 10 ℃ to 60 ℃, temperature change rate is: more than 1 ℃ / min, but less than 5 ℃ / min.

4.The test box be keep at 0.5h at high temperature and 0.5h at low temperature for 8 cycles.

Test requirement: after the temperature cycle test of the power supply, there should be no leakage, AC/DC input and output and other abnormal phenomena.



6.5.  Constant damp heat test

Testing method:

Place the 3 PCS in a constant temperature and humidity box, constant temperature and humidity box set to 95% relative humidity, temperature 45 ℃.

Switch on the power supply and light the lamp for 48H according to the rated input voltage of the power supply.

After the sample is taken out, wipe off the water droplets on the surface and put it under normal atmospheric pressure and normal temperature for 2H for inspection.

Test requirement: 1. Appearance without rust, crack or other mechanical damage.

the power supply should be no leakage, AC/DC input and output and other abnormal phenomena.

 

6.6 Vibration test

Testing method

1,Pack 3pcs power supply samples and place them on the vibration test table.

2,Set the vibration speed of the vibration tester as 300 RPM and the amplitude as 2.54 cm, and start the vibration tester.

3,Test the power supply for 30 minutes in the above three directions: upper and lower, left and right, front and rear respectively.

Test requirement: after the vibration test of the power supply, abnormal phenomena such as parts falling off, structure damage and AC/DC input and output cannot occur.

 

7. Environment requirement

  7.1 Working temperature and humidity: -5 to 45℃, humidity less than 95%

  7.2 Storage temperature and humidity: -10 to 60℃, humidity less than 70%

 

 

8. Standard of security

8.1 Safety standard: EMC Directive 2014/30/EC

J55015(H20)    FCC Rules and regrulations part 15 subpart B class B

  8.2 Various of compatibility: EMC Directive 2014/30/EC

J55015(H20)    FCC Rules and regrulations part 15 subpart B class B

 

 

9.Test report and related certificate(SGS/MSDS)

FCC certificate

CE certificate

RoHS certificate

 

10. Inspection standard :

10.1 sampling standard GB-T 2828.1-2003  normal single Level Ⅱsampling,reception standard AQL: CR=0; MAJ=0.4; MIN=1.5.

10.2 Defect classification definition

Critical defect: It refers to the defects (such as CE, FCC, UL, CCC, RoHS and other safety regulations and environmental protection requirements) that endanger the safety of the user or carrier or do not meet the requirements of the laws and regulations of the country where the user is located or that the unit product loses its basic use function.

Major defect: A defect that does not constitute a fatal defect but is likely to cause failure or seriously affect the performance of the unit product and the appearance of the product.

Minor defect: A defect that does not cause a fatal or major defect, does not affect the functionality of the product, and has only a minor effect on its appearance.

 

11. Pictures of product inner package(included accessory and specification)

询价单
total0items  Comments