Homepage|Business Center|Save the Page|Get the App
普通会员

Shenzhen Chinaok Electrical Appliances Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Fire Emergency LED Emergency Device Electronic Inverter
Fire Emergency LED Emergency Device Electronic Inverter
Click on the image to view the original image
Product: views:19Fire Emergency LED Emergency Device Electronic Inverter 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2020-12-18 12:21
  Negotiated
Product Details

Fire Emergency LED Emergency Device Electronic Inverter 

Description

12V 4000mah Ni-ci battery pack 
Emergency working time: 2 hours
AC 220-240W (emergency power 15W)

Charging time:>24 Hours

Product Description

 

An Attractive Canton Fair of Emergency Exit Sign Light-Chinaok Booth 12.2K48 

 

TE-600AL 

features:  

*Injecton-molded ABS housing 
*Innovative,snap-together design allows for fast installation
*Two fully adjustable glare-free square shape light heads for emergency light
*Wall or ceiling mounting
*110-240VAC dual voltage operation
*LED 2x6pcs 2.4W lamps for emergency mode
*Lead Calcium 6V 4.5AH battery
*Discharge protection

 

parameters: 

Name

LED Emergency Light

Operation

AC 110-270v voltage operation

Model

TE-600AL

Operation Time

3 Hours

Brand Name

CHINAOK

Housing 

Injection-molded ABS housing

LED Type

SMD 5050 2.4w lamp

Protection Level

 IP65

LED Qty

2*6pcs LED 

Mounting 

ceiling mount or wall mount

Certification

UL, CE

Guarantee

 2Years  

product display

 

 

  Related Hot Sale Products 

 

Conduit Installation:

1. Secure mounting palte to wall surface. Feed wries through hole in conduit flange and make conduit

    connection. Make AC power connection as explained in the above.

2. Snap light head housing top frist and then bottom.

 

Operation:

1. Reapply AC power and check that indicator RED indicator is light.

2. Push Test button to simulate AC failure. Lamp will illuminate indicating proper operation.

 

Caution:

Battery in this unit not be fully charged. Allow 24hours recharging time after installation or power failure for full load testing.

 

 

Related Products

We warmly welcome OEM/ODM projects. For more than 8 years time in the market CHINAOK has thrived on committing to our customers best prices, best services and best quality in everything we supplied and will continue our commitment in the coming years

.

 

Packaging & Shipping

Packaing:

1pc/white box or color box

(when the order is 1,000 pcs or more than 1,000 pcs, the color box will be free.)

(Color box is customizable.)

Shipping:

Loading Port: Shenzhen or Ningbo China.

Shipping Method: Courier, Air Transport, Sea Transport.

Accept order: Full Container Cargo Load, Less Container Load

Service: EX-WORK, FOB, CIF,C&F,Door to Door etc.

We offer courier shipment through DHL, FEDEX, TNT and UPS and other international courier company. 

The tracking number will be provided to you once the consignment is shipped.

Our Services

1. OEM service

♥ Logo printing on the product
♥ Product body color customizing
♥ Customized box(packing) printing
♥ Customized lighting color
All the above service will produce extra cost. The cost will vary according to the order quantity and customizing requirement. For detailed cost, please contact with us.

2. Courier and air shipping service

We provide courier and air shipping for samples and small testing orders. For detailed shipping cost, please contact with us with your estimated order quantity and shipping destination.

3. Guarantee

A.Two years free warranty: Within two years of purchase, we offer free warranty for any defect occuring under normal usage (non-human factor). 

B.Limited lifetime warranty: If problems develop after two years of purchase, we will provide maintenance with charge for parts and shipping. The total repair fee is assessed according to the cost of the replaced materials and no extra reparation fee will be charged.

Company Information

Shenzhen Chinaok Electrical Appliances Co,ltd, established in2006, located at Shenzhen, China. Specialized in Emergency ligt. We are fousing the technology improvement and increasing the technology-content of our productions. In order to creating the most excellent brand and improving the high-quality customer service, we are keeping on in improving the core competence ability.

 

FAQ

Q1:Why Choose Us?
A1:1.We are Alibaba Assessed 3 years Gold Supplier.
     2.We are the professional factory manufacturing led exit sign emergency light

        best production capability, best quality control, best Service .
     3.Approved by the Inspection Institution of Bureau Veritas Certification.
     4.100% QC inspection Before Shippment.
     5.CE/UL/FCC listed, competitve price.

 

Q2:What is your product Voltage?
A2: Our product have been designed a wide Voltage.They can be produced 110V,120V/277V, 220- 240V.

 

Q3: what's your working hours?
A3: Our working hours is 9am to 18pm GMT+8. And your usually will be replied within 24 hours after we get it. There is a delay in the Alibaba system. So it may be 24 hours later after your make the inquiry. (For fast response, you can send us e-mails directly.The more details you provide in your inquiry, the faster and the more precise you will get our feedback.)

 

For any other questions, you can contact with us freely.

Contact: Icy

Mobile: +86-18126129837 ( Whatsapp, Wechat )

询价单
total0items  Comments