Product Details
Coreshine S-LINE Linear Lighting System is an energy-efficient, low maintenance cost and better alternative to traditional linear fluorescent in a variety of industrial, commercial and light assembly applications.
* Cost-effective light-line solution for industrial, commercial and other applications
* Good quality of light with high lumen output to meet different requirements
* Easy to install, reducing time, labor, packaging waste and complexity
* Flexible solution
* Good quality of light with high lumen output to meet different requirements
* Easy to install, reducing time, labor, packaging waste and complexity
* Flexible solution
Item | LED Linear Lighting System S-Line | Efficiency | 160lm/w | ||
Material | Alumium+PMMA lens/PC cover | UGR | <19 | ||
Dimming | DALI, 1-10V, DIMswitch | PF | >0.95 | ||
Certifications | CE/CB/ETL/DTC/SAA/FCC/GS/UL | THD | <15% | ||
Connector | L/T/X Node Connector can be choose | Driver | Coreshine/Rubycon | ||
LED Chip | SMD 2835 | Lumen | 4800lm-19800lm | ||
Function | Dimmable(DALI/1-10V), Emergency, Sensor, Track Spot Light | ||||
Lens | SP(Sharp-25°), NR(Narrow-60°), WD(Wide-90°), FD(Flood-120°), DS(Double Asymmetric), RS/LS(Right/Left Asymmetric), FF(Flat-120°) |
Length | Power | Lumen | Code NO. |
1200mm | 30W | 4800lm | CFL-1230-X1X2-X3WH |
1200mm | 40W | 6400lm | CFL-1240-X1X2-X3WH |
1200mm | 60W | 9600lm | CFL-1260-X1X2-X3WH |
1500mm | 35W | 5600lm | CFL-1535-X1X2-X3WH |
1500mm | 50W | 8000lm | CFL-1550-X1X2-X3WH |
1500mm | 70W | 11200lm | CFL-1570-X1X2-X3WH |
2400mm | 60W | 9600lm | CFL-2460-X1X2-X3WH |
2400mm | 80W | 12800lm | CFL-2480-X1X2-X3WH |
2400mm | 120W | 19600lm | CFL-24120-X1X2-X3WH |
Our Advantages
Supermarket | Tube Fixture | Coreshine System |
Illuminance on floor(lux) | 700lx | 1000lx |
Luminaire | T8-2*58W | Coreshine S-line 150lm/W 55W Wide distribution for shopping area Asymmetric for wall washer |
Power consumption per luminaire | 116W | 55W |
Number of luminaires in building | 1002pcs | 1002pcs |
Light arrangement | luminaire+blind... 2m per module | luminaire+blind...2m per module (1416mm+570mm) |
Total power consumption | 116,232W | 55,110W |
Kilowatt hours p.a. | 581160kWh | 275550kWh |
Energy saving potential | 53% | |
Energy cost saving p.a. | 48,897€/a (@0.16€/kWh) | |
CO2 saving p.a. | 171 t/a | |
Installation time | 10 days | 5 days |
Recommend Products
Why Choose Us
Package & Delivery
Quantity | Shipping way | Shipping time | Delivery |
1-3 samples | DHL/UPS/FEDEX/TNT | 3-5 days | within 48 hours after receipt of payment |
1-3 samples | Shipping by Air | 5-8 days | within 48 hours after receipt of payment |
1-3 samples | Shipping by Sea | 15-30 days | within 48 hours after receipt of payment |
Certifications & Services
OUR SERVICES
1.We will reply to the lead time within 24 hours after receiving the customer's confirmation of each order.
2.Take photos of the goods during production and send them to customers.
3.Take pictures of goods after packaging and labeling and send them to customers.
4.Take photos of goods loading before shipment, and arrange the customs clearance information of goods and send them to the customers.
5.We will track the logistics information and update it to the customer at any time if the goods are delivered by express.
6.We will remind the customer to prepare the customs clearance documents for the goods before they arrive at the port.
FAQ
Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A:Sample needs 5-10 days, mass production time needs 3-4 weeks for order quantity more than 1000pcs
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Q6. Is it OK to print my logo on led light product?
A: Yes.only available for mass order.
Q7: Do you offer guarantee for the products?
A: Yes, we offer 5 years warranty to our products.
Q8: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.3%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution
including re-call according to real situation.
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A:Sample needs 5-10 days, mass production time needs 3-4 weeks for order quantity more than 1000pcs
Q3. Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.
Q6. Is it OK to print my logo on led light product?
A: Yes.only available for mass order.
Q7: Do you offer guarantee for the products?
A: Yes, we offer 5 years warranty to our products.
Q8: How to deal with the faulty?
A: Firstly, Our products are produced in strict quality control system and the defective rate will be less
than 0.3%.
Secondly, during the guarantee period, we will send new lights with new order for small quantity. For
defective batch products, we will repair them and resend them to you or we can discuss the solution
including re-call according to real situation.