Home>Products> 2021 Meiju Q4 650R Best 650W Led Grow Light, Using Newest Samsung Lm301H Led Grow Light For Indoor Plants Growing
2021 Meiju Q4 650R Best 650W Led Grow Light, Using Newest Samsung Lm301H Led Grow Light For Indoor Plants Growing
Click on the image to view the original image
Product:
views:242021 Meiju Q4 650R Best 650W Led Grow Light, Using Newest Samsung Lm301H Led Grow Light For Indoor Plants Growing
Unit Price:
Negotiated
Min.Order:
Supply:
Delivery:
Shipment within days since the date of payment
Valid until:
Long Term
Updated on:
2020-12-23 11:43
Product Details
Products Description
MEIJIU-Q4-650W-V2/V3
Each kit include:1. 4PCS high efficiency PCB board (301B 648PCS+660nm 18PCS with cover
2. 1PCS heatsink 740x560X4mm
3. 1PCS 600W Inventronics driver EUD-600S12ADT with knob dimmer
4. 1PCS plug wire
5. 4PCS adjust hang wire
Fixture size: 740x560x35mm (2.43'*1.84')
Warm Tips: 1. Do NOT touch while in operation. 2. To prevent eye damage, avoid looking directly at the LEDs. 3. In summer or other hot environment, please use a cooling fan to keep a suitable temperature for your plants.
Dimension with Packaging
790*610*152
Heatsink Material
AL-6063-T5
Gross Weight
16KG
Footprint
Standard Coverage: 4'*4' Maximum Coverage: 6'*6'
Working Frequancy
50/60 HZ
Our Advantages
Advantages
1. High power and PPFD with highest efficiency (2.9/3.0umol/j),
2. It fits for 4'*4' grow tent with maximum coverage: 5'*5', 6*6‘,
3. It is east to install, detach, and the distance of the grow lights can be adjusted as per your personal need, 4. The driver is detachable which allows the wire to be prolonged, 5. Reliable passive cooled design. The raise of working temperature of heat sink is with 30 degrees, under 27 degrees, 6. 1 Year Warranty for board. 3 years Warranty for Inventronics driver, 7. Perfect performance for vegtative and flowering, 8. The light board is with protective lampshade, which can protect the light board from hit, dust and water, 9. Can be controlled by PWM Intelligent Controller,
10. We all upgrade silver heatsink, A It's easier to dissipate heat than the black heat sink, because the light can cover the plants more widely by the reflection of silver. B The cooling effiency is better than the black one. As you know. Black is endothermic.
Quality Control
Test Report
Customer Feedback
Certifications
Packaging & Shipping
FAQ
Q1: What are payment terms for new customers? A: Usually we make transaction via alibaba trade assurance. after we set up an order, you can pay with Credit Card, Visa, E-checking, Western Union or T/T.
Q2: Do I need solder when receive the lights? does it come with instruction? A: You needn't solder when you receive the lights, in the package it will have instruction paper, all of our lights come with free assembly.
Q3: What about the lead time? A: For order under 50 sets, we can ship in 3 days after payment made. For order more than 100 sets, we can ship in 7-10 days after payment made.
Q4: How do you ship the goods and how long does it take to arrive? A: We usually ship by DHL, UPS, FedEx; It usually takes 3-5 days to arrive; Ship to door takes around 15 days by air.
Q5: Can I print my logo on the fixture ? A: Yes, we can print your logo on the supporter.
Q6: Do you offer guarantee for the products? A: Yes,We offer 3 years warranty to our products. all of our lights use samsung top bin and come with 17 production process.
Q7: Can I order directly? A: Yes, please click start order, choose color spectrum and quantity, fill your delivery address and phone number, confirm your order, make payment, then we will arrange the shipment in 2 working days once received payment.