Homepage|Business Center|Save the Page|Get the App
普通会员

Xiamen Tmax Battery Equipments Limited

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Lab High Temperature 1200C-1700C Vertical Tube Quenching Furnace for Heat Treatment
Lab High Temperature 1200C-1700C Vertical Tube Quenching Furnace for Heat Treatment
Click on the image to view the original image
Product: views:2Lab High Temperature 1200C-1700C Vertical Tube Quenching Furnace for Heat Treatment 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2021-12-28 12:12
  Negotiated
Product Details
Product Description
Lab High Temperature 1200C-1700C Vertical Tube Quenching Furnace for Heat Treatment

 

Technical parameters

Model

VTL1200-I

VTL1200-II  

 Power

3.5  KW

3.5  KW

 Tube size

Dia 60(OD) X1000mm

Dia 80(OD) X1000mm

Supply voltage

220V

Phase

single phase

Heating element

A1 imported resistance wire from Sweden (resistance wire can be guaranteed for 2 years)

Control mode

 

 Use Yudian program temperature control instrument (standard)

1. 30-segment program temperature control intelligent PID adjustment.

2. With over-temperature protection, the electric furnace heating circuit will be automatically cut off when the temperature is over-temperature or when the couple is broken. ON, the ON light on the panel is off, the OFF light is on, and the electric furnace is limitedly protected).

3. With 485 communication interface (standard with optional software)

4. It has a power failure protection function, that is, when the furnace is powered on after the power is turned off, the program does not start from the initial temperature, but starts from the furnace temperature when the power is turned off.

5.The meter has the function of temperature self-tuning  

(replacement of imported instruments requires additional payment and purchase)

                                 

FP93 control instrument(SHIMADEN)       EUROTHERM      touch screen

Break couple protection and display

Yes

Over-temperature protection

Yes

Overcurrent protection

Yes

Control precision

+/- 1 ℃

Flip-flop

Phase-shifted trigger

Electric appliance

Zhejiang chint

Silicon controlled

106/16E SEMIKRON

Max temp

1200 ℃    

Rated temp

1150 ℃    

Heating rate

≤30 ℃/ Min (can be modified as required)

Recommended heating rate

≤15℃/ Min

Thermocouple Type

Heating length

440mm

Electrical certification

CE

Ambient surface temperature

≤45℃

Vacuum seal flange and valve

1. A stainless steel sealing flange and stainless steel needle valve are installed on the top of the furnace body.

2. A plug-in valve, a non-mechanical pressure gauge and a KF-25 vacuum interface are used to connect the vacuum pump at the bottom of the furnace body.

3. Vacuum degree: The vacuum degree of the mechanical pump can reach below 1Pa. If you want to obtain a higher vacuum degree, you can choose a domestic or imported high vacuum unit.

Optional: The following accessories increase vacuum efficiency

4.KF25 stainless steel bellows, KF25 quick remover clamp

5. Optional anti-corrosion digital vacuum gauge with a measurement range of 3.8x10-5 to 1125 Torr. No coefficient conversion is required due to different types of measurement gases.

 

6. At the top of the flange is installed an electromagnet sample hanging device that can withstand a maximum of 500g. As shown in Figure 1, the sample is hung on the hook through the hanging wire, as shown in Figure 2. Click the control button of the sample hanging device of the electromagnet. The hanging wires fall together into the quenching box, as shown in Figure 3. Before releasing the sample, 5 PSI of argon must be flushed in and the manual flapper valve at the bottom of the furnace tube opened. Pic 4 is the hanging wire

 

      Pic 1               Pic 2                   Pic 3               Pic 4

Quenching container

1.A stainless steel box for quenching liquid is fixed at the bottom of the furnace tube

2. A large manual plug valve is installed between the bottom of the furnace tube and the liquid box

Warranty period

One year warranty and lifetime technical support

Special Note:

1. Consumable parts such as heating elements, furnace tubes, sample crucibles, etc. are not included.

2. Damage caused by the use of corrosive gases and acid gases is not covered by the warranty.

 

Precautions

1. The air pressure in the furnace tube cannot be higher than 0.02MPa.

2. Due to the high internal pressure of the gas cylinder, a pressure reducing valve must be installed on the gas cylinder when gas is introduced into the furnace tube. To ensure safety, it is recommended to use a pressure below 0.02MPa.

3. When the furnace tube used is corundum tube, when the furnace temperature is higher than 1500 ° C, the furnace tube cannot be in a vacuum state, and the pressure in the furnace tube must be equal to the atmospheric pressure.

4. The gas flow entering the furnace tube needs to be less than 200SCCM to avoid the impact of the cold air flow on the hot furnace tube.

5. For the experiment of sample heating, it is not recommended to close the suction valve and inlet valve of the flange end of the furnace tube. If you need to close the gas valve to heat the sample, you must always pay attention to the indication of the pressure gauge. If the pressure is greater than 0.02MPa, you must immediately open the exhaust valve to prevent accidents (such as furnace tube rupture, flange flying out, etc.) .

6. Do not use graphite crucibles in alumina tubes.

 

Standard fittings

Item

   Qua

                              Pic

 Vertical tube furnace

 1

 

 Tube 

1

 

Stainless steel low flange

 1

Stainless steel top flange

        1

                                              

  Stainless steel hook

 1

 

  Alumina ceramic thermal block

2 pairs

 

Thermal gloves

 1 

Quartz crucible

 1 

 

Ktype  thermocouple

        1

 

  USB/RS485 computer interface kit

 1

 

 

 

 
Our Company & Team

Certifications
Cooperative Partner

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

FAQ
About Product

 1.Which procedure to secure your Quality?

Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.
2.How about your company product after-sales service system?
Product after-sale guarantee period is 12 months,and we can provide lifetime repair guarantee.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.
3.Products standards?
Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.
4.Our country's power supply and plug are different, how do you solve it?
We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.
5.Payment methods?
T/T, L/C, D/P and so on
6.Packing method?
Standard export wooden box packaging
7.How about customers evaluation for your products?
Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek,our high quality products and first-class after-sales service.Our services get the trust of the customer satisfaction and recognition for themselves.
8.Main export market?
Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.
10.How to ensure the customer standard use the instrument?
We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.
 
About Shipping

 1.Order processing?

Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
3.Order tracking?
Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 

 

询价单
total0items  Comments