Manual feeding on the coating platform (fixed by adsorption) - feeding system feeding die head - coating platform forward positioning - die head down positioning - start coating - coating system coating according to the set parameters - coating completion - feeding stop - manual product removal - completion.
Equipment composition
1) Substrate positioning platform
2) Feeding system
3) Slit coating unit
4) Platform adsorption
5) Coating die position control, platform moving unit
Specifications
1. Basic parameters of base material |
|
Type |
Glass, silicon, flexible/soft sheet |
Thickness |
0.05~3mm |
Base material length and width |
Max.200mm W X 300mm L |
2. Coating parameters |
|
Coating thickness (dry) |
0.05-15um(for reference, actual depends on solution characteristics) |
Solid content |
10-70 |
Viscosity |
1-10000cp |
3. Basic parameters of the machine |
|
Coating method |
Slot die coating |
Effective width of coating |
Max. 200 mm; |
Coating platform speed |
0.06m-3m/min |
Coating platform |
250mm W*350mm L,Platform flatness: ± 0.05mm |
Power Supply |
220 V, 50 Hz |
Total power |
Max. 2 KW (with heating on) |
Air source |
0.6 MPa |
Machine dimensions |
Max. 1200mm L X 450mm W X 450 mm H(for reference, subject to final dimensions) |
Coating unit
Coating method |
Slot die coating |
Distance between die head and platform |
Fine adjustable range: 0.01-10mm Unit adjustment accuracy: 0.002mm Coarse adjustable range: 0-20mm With cleaning tank |
Die head (effective width 200 mm) |
included |
Platform driven |
Servo motor + ball screw + servo controller |
Platform adsorption/baking unit
Heating platform |
Al alloy, surface oxidation, accuracy 20μm |
Heater |
Electric heating components |
Heating temperature |
Temperature: RT-160 ℃, temperature control accuracy ≤± 3℃ (effective area: 200mmX300mm) |
Platform adsorption |
Aperture: 0.5mm , hole spacing: 25mm |
PACKAGE:
1 Standard exported package: Internal anticollision protection, external export wooden box packaging.
2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
3 Responsible for the damage during the shipping process, will change the damage part for you for free.
DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.