Homepage|Business Center|Save the Page|Get the App
普通会员

Xiamen Tmax Battery Equipments Limited

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > Li-ion Battery Manual Winding Machine For 18650 Cylindrical Battery Making
Li-ion Battery Manual Winding Machine For 18650 Cylindrical Battery Making
Click on the image to view the original image
Product: views:3Li-ion Battery Manual Winding Machine For 18650 Cylindrical Battery Making 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2021-12-28 12:20
  Negotiated
Product Details
Product Description

Li-ion Battery Manual Winding Machine For 18650 Cylindrical Battery Making

 
 
 
 
 

Features

TMAX-JK-JRJ-01 is a CE Certified semi-automatic winder for winding electrode and separator together in the research of Li-ion pouch batteries and cylinder cell & cylindrical cell.

 

Technical Parameter

Working Voltage

220VAC 50/60Hz

Max. Power Consumption

25W

Winding Speed

0-140 RPM Adjustable

Winding Blade for pouch cells

·         Dimensions: (20-90)mm(L) x (15-60)mm(W), specially designed for winding pouch cells

·         The winding width depends on the width of the winding blade.If other size is needed please contact us for customization

Winding Shaft for cylinder cells

·         Dimensions: 4mm(OD) x 65mm(L) for 18650, 26650, 32650 cylinder battery core

Warranty

Two years limited manufacturer warranty with lifetime support.

Dimensions of Machine 

L550mm*310mm*280mm

Winding mode

Switchable between clockwise and counterclockwise

Compliance

CE Certified

Net Weight

25kg

 

Product Images

Our Company & Team

Certifications

CERTIFICATE

Strength Proof

All our products are passed the inspection standards included SGS, CE, ASTM with 100% quality.

Cooperative Partner

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

FAQ
About Product

 1.Which procedure to secure your Quality?

Our company has own research & development and production base, the products have been calibrate by central laboratory professionals before before they leaves the factory, ensure the accuracy of test results and authority.
2.How about your company product after-sales service system?
Product after-sale guarantee period is 12 months,and we can provide lifetime repair guarantee.We have agents in some countries,they can provide door-to-door service.If there is no agent,our professional pre-sales and after-sales department can reply you within 24 hours for any technical problems.
3.Products standards?
Our instruments adopts ISO, ASTM, DIN, EN, GB, BS, JIS, ANSI, UL, TAPPI, AATCC, IEC, VDE and other international testing standards.
4.Our country's power supply and plug are different, how do you solve it?
We can according to different countries and the power plug, equipped with transformer and plug that in accordance with your local requirement.
5.Payment methods?
T/T, L/C, D/P and so on
6.Packing method?
Standard export wooden box packaging
7.How about customers evaluation for your products?
Our company has established long-term cooperation with the SGS, Bureau Veritas, TUV and Intertek,our high quality products and first-class after-sales service.Our services get the trust of the customer satisfaction and recognition for themselves.
8.Main export market?
Now our products have been exported to North America, Europe, southeast Asia, South America and other countries.
10.How to ensure the customer standard use the instrument?
We can provide each product related video showing how to install and operate.If you have specific needs, we also can arrange engineer to the customer's company for equipment operation training.
 
About Shipping

 1.Order processing?

Please allow a processing time of 12-24 hours for your order(s) to ship. Equipment orders will take up to 2 weeks before leaving our warehouse. (Order processing is done during normal weekdays only, no holidays or weekends.)
2. Shipping methods?
1 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.
2 Responsible for the damage during the shipping process, will change the damage part for you for free.
3.Order tracking?
Online order can be tracked by login to your account. Please allow 24 hours after order is shipped to see logging details.
If you need a tracking number for your order, please send an email to us with your order/invoice number.
4. Import/export tax, duty, GSM, Customs Clearance, and etc?
All import/export related expenses are sole responsibility of the buyer; charges will vary from country to country. Please consult with your local import experts or transportation carrier for more details.
5.Lost or Stolen packages?
Please report all lost or stolen packages to us at the earliest possible time. An investigation will be open soon after reporting the incident to us, and a final ruling will be issued by the carrier for the claim after 10-15 business days. A replacement package will be sent as soon as the claim is accepted by the responsible carrier.

 

询价单
total0items  Comments