Homepage|Business Center|Save the Page|Get the App
普通会员

Wofu Fire & Security Equipment Co., Ltd. (Yongzhou City)

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > emergency light bulb ceiling mounted with battery
emergency light bulb ceiling mounted with battery
Click on the image to view the original image
Product: views:4emergency light bulb ceiling mounted with battery 
Branch: customize
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 21:09
  Negotiated
Product Details
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
customize
Bulb Type:
yellow bulb
Battery Type:
Lead-acid
Material:
ABS material
Usage:
emergency light
Certification:
RoHS
Specifications:
6W
Voltage:
220V/110V
Lead Acid Battery:
6A 4.5 AH
Product size:
14*9.5*31.6cm
Emergency Duration:
>90min
Service environment:
-10℃~ 50℃
Switch time:
<3s
Supply Ability
Supply Ability:
10000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
1pc inner white carton+6pcs outer brown carton
Port
ningbo
Product Description

 

Company Information

 

FAQ

Emergency light yellow bulb

 

1.Main specification:

Wall or Ceiling mounted type
Voltage:220V/110V
Light source:2pcs lamp,5W each
Lead Acid Battery: 6A 4.5 AH
Emergency Duration: >90min
24Hours recaharge time, after 300 minutes discharging
Test Switch And charge Rate indicator
Low Voltage Batter Disconection
Products size 30.8*14*10.1CM

2.Packing details:

QTY/CTNN.W./CTNG.W./CTNCBM/CTNCTN SIZE
6pcs10.6kgs11.25kgs0.036m334*33.3*32cm

 

 

3.Emergency light structure and mounting instruction:

 

Wall Mounting

1. Remove mounting plate from fixture by prying with screwdriver(See Fig.1)

2. Insert screwdriver to make appropriate keyhole slots open on mounting plate.

3. Pass blue(neutral) and either black 120V or red 277V hot,wire leads through center hole of mounting plate,make electrical connection in junction box, see electrical connection below.You may use hanging hook to hang fixture while making connection. Cap off unused hot lead.

4. Mount mounting plate to junction box with screw provided 8#32×1"long.

5. Connect red lead to battery positive terminal.(See Fig.2)

6. Snap on fixture to mounting plate.

7. Restore power and press test button.Bettery powered builds will come on. AC light will turn off.

Ceiling Mounting

1. Remove mounting plate from fixture by prying with screwdriver gently. (See Fig.1)

2. Open top cover and knockout on the top of fixture.

3. Secure the mounting plate to tube with nut.

4. Pass blue(neutral) and either black 120V or red 277V hot,wire leads through center hole of mounting plate,make electrical connection in junction box, see electrical connection below.You may use hanging hook to hang fixture while making connection. Cap off unused hot lead.

5. Connect red lead to battery positive terminal.(See Fig.2)

6. Snap on fixture to mounting plate.

Restore power and press test button.Bettery powered builds will come on. AC light will turn off.

 

 

询价单
total0items  Comments