Homepage|Business Center|Save the Page|Get the App
普通会员

Wofu Fire & Security Equipment Co., Ltd. (Yongzhou City)

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > The Process to assembly coupling in fire hose
The Process to assembly coupling in fire hose
Click on the image to view the original image
Product: views:6The Process to assembly coupling in fire hose 
Branch: welfare
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2019-10-16 21:10
  Negotiated
Product Details
Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
welfare
Motor power:
3kw
Die interface thread:
M58*2
Nominal pressure:
3.5Mpa
The maximum pressure:
4.5Mpa
Supply Ability
Supply Ability:
10000 Set/Sets per Month
Packaging & Delivery
Packaging Details
one set packed in one carton,size: 100x70x80cm,G.W: 120KG.
Port
Ningbo Port of China
Lead Time:
Quantity(Sets)1 - 50 >50
Est. Time(days)15To be negotiated
Product Description

 

Company Information

 

 

FAQ

Hose mouth stretching equipment

One, main characteristics:

1,Beautiful shape, compact structure, convenient installation, layout

2,Machine, hydraulic, electric control, convenient adjustment, simple operation, easy maintenance

3,The equipment is reliable, convenient replacement.

4,Easy to use little power, preparation of low operation cost, low processing cost.

5,Low noise, good working environment, low labor intensity of workers

6,High production efficiency, fully meet the requirements of mass production

Two, the main parameters:

1,Nominal pressure 3.5Mpa

2,The maximum pressure 4.5Mpa

3,Tension cylinder diameter 110mm

4,Die interface thread M58*2

5,Motor power 3kw

6,Cylinder stroke 150mm

7,Processing range 1.5 inch, 2.5 inch

8,The machine appearance dimension ( length * width * height ) 870*600*1100mm

 

Three, main functions and features:

Special equipment suitable for hose and fittings interface tension.

 

Four, operation mode:

The product is placed in a mould →press the pedal switch→cylinder backward→when proximity switch stop→start the return delay ( the time can be adjusted.) →the time to→cylinder automatic return→stop touching of proximity switch, ( near the adjustment according to the tightening degree switch ) →completion of jobs→remove the workpiece→and so

 

Five, the matters needing attention

1,In the process of operation, should notwear gloves

2,Pump after open, check the pump is the clockwise

3,The tension pressure can be adjusted according to the size of the product oil pressure, the maximum pressure is 4.5Mpa



询价单
total0items  Comments