Homepage|Business Center|Save the Page|Get the App
普通会员

Wuxi Neon Electrical Equipment Co., Ltd.

Product Category
  • No Category Yet
Search
 
Link
  • No links
Home > Products > e17 base Tower Strobe Flash Bulb Christmas Lights
e17 base Tower Strobe Flash Bulb Christmas Lights
Click on the image to view the original image
Product: views:3e17 base Tower Strobe Flash Bulb Christmas Lights 
Unit Price: Negotiated
Min.Order:
Supply:
Delivery: Shipment within days since the date of payment
Valid until: Long Term
Updated on: 2021-01-06 15:21
  Negotiated
Product Details
Product Description

e17 base Tower Strobe Flash Bulb Christmas Lights

Product name
e17 base Tower Strobe Flash Bulb Christmas Lights
Keywords
e17 strobe bulb light
Voltage
110V
Holiday Name
Christmas
Power Source
AC
flash frequency
1times/second
LED lifespan
50,000hours
certification
CE
using
outdoor holiday lighting
light source
LED
Life
50,000h
Color
Red,Clear,Blue,Green,Yellow
Input Voltage
110v/220v
lamp base
C9,E14,E27,B22
Detailed Image
Related products

  M5 String Lights                  C7 C9 LED Bulb                  C7 Magnetic Light Clips        UL C7C9 Light String

Packing & Delivery

Package:

1 Drop-proof packaging inside and hard carton box outside
2 Waterproof packaging
3 Or packed as your requirement

Delivery
1.Goods will be delivered within 10-20 working days after getting the payment
2.Shipped via EMS, DHL, Fedex, UPS, Door to Door service express or air and sea

Our Service

Should any of these items be of interest to you, please feel free to let us know.

We will be happy to give you more details. 


FAQ

Q1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


Q2. Is it OK to print my logo on led light product?
A: Yes. Please inform us formally before our production and confirm the design firstly based on our sample.


Q3. Are you a factory or foreign trade company?
A:We have our own factory. And Wuxi Neon Electrical Equipment Co., Ltd. is one of the best decoration lighting enterprises. We integrate the R&D, manufacture, sales and engineering as a whole


Q4. What about the lead time?
A:Sample needs 3-5 days, mass production time needs 1-2 weeks for order more


Q5: Do you offer guarantee for the products?
A: Yes, we offer guarantee for our products.

Our Company
询价单
total0items  Comments