two floors lightgage steel joist structure villa house steel structure villa building
Earthquake proof, fireproof, LGS Framing life span over 50 years.
Prefabricated House LGS-light gauge steel framing system follows NZ system, adapting advanced
FrameCAD, 50 years life span are guaranteed. Framing system contains: moisture proofing
and thermal insulation roof, the material layers from outside to inside are asphalt shingle,
housewrap, osb board, fiber glass, foil film, adhensive tape, stud, gypsum board ceiling.
DIY wooden grain Modular prefabricated homes light steel Prefab+Houses log cabin
Prefabricated steel framed biudings, portable cabins, kitset homes, emergency shelter and housing
By using light steel as its framework, materials are sandwich panel, total new conception and economical and environmental
protected house, which also called prefabricated houses.
2) Specifications of the whole lifting portable house:
*Steel Frame: high quality steel structure 4mm steel profile
* Wall Panel:
1) 50mm/75mm/100mm sandwich board(with EPS, PU for its interlaye)
2) Cement & EPS sandwich panel
* Roof Panel:
1) 50mm/75mm/100mm sandwich board(with EPS, PU for its interlaye)
2) Color-glazed roof sheet
* Windows: Aluminium alloy window or plastic steel windows
* Doors: sandwich board door or aluminium alloy door
* Bathroom: it will be equipped with one toilet bowl, one wash basin, one shower equipment( alternative)
* Kitchen: it will be equipped with one kitchen cabinet(alternative)
* Eletricity: we will supply all the electricity system and equipement(alternative)
* Color: you can choose any color you like(both for the outside and inside)
A. Prefab house Wall and roof frame of steel frame villa:
1) GI cold frame forming steel designed with advance software. And make the production automatically .
Cold-formed galvanized steel frame members, G550, Z275G/M2, life spen over 50 years
B. Roofing & Ceiling of luxury light gauge steel villa:
1) metal roof sheet/roof tiles
2) waterproof layer
3) OSB board
4) 75mm+100mm insulation for roof
5 Include flashing, screws, sealant
6) Ceiling:1 layers 12mm plaster board
C. Wall panel of prefabricated modern villa house:
1) Culture stone external wall finish,50mm, 75mm, or 100mm insulation materials(such as eps/rockwool/glasswool),12mm plasterboard for external wall panel
1) 12mm OSB for wall base board
2) 12mm plasterboard at each side
3) Waterproof plasterboard for wet area
4) Include flashing and screws
D. Flooring of light steel frame house villa:
1) Galvanized G550 200 C section at 600mm thickness for floor beam
2) 18mm OSB and 75mm insulation for floor
3) 1 layers 12mm fire rated plasterboard for floor ceiling
4) Include connection bolts and fasteners
E Internal View
4 Installation:
Firstly, to weld the stell frame onto the foundation. Then to fix the window and door, and inlay all board onto the frame. Seal with glue.
It will take about one month for 12 workers to finish the main structure, almost external and internal wall decoration of villa, which is about 600sqm and three floors. Installation duration is the 1/6 than traditioanl construction's. Meanwhile all materials are lightweight and simple to install, no need giant construction machine.
Some steel frame is pre-assembled together, loading in containers
1. Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers’ request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
2.What’s your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, WZH will responsible for all quality problems caused by production.
5. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.