There are two major advantages with air source heat pump (ASHP): energy saving and comfortableness. It is the equipment that many families will choose. Air source heat pump can provide house heating/cooling, as well as domestic hot water. Speaking of the advantages of air water heat pump floor heating, many friends who want to install the floor heating system will want to know the pre-installation process first. Now we will introduce to you the installation steps and process of under floor heating with air source heat pump.
First, we will simply explain to you that the preparation work before the installation of air source floor heating includes the measurement of the whole house and the heating/cooling project scheme that needs to be determined. After that, the construction team will install the heat pump system based on related design drawings.
OSB 18.5KW-23.2KW Air to Water Heat Pump for Floor Heating
Installation Step 1: Paving the Ground
Paving the ground is the first and key step for the installation of the air source under floor heating system. Before paving the floor, it is necessary to clear the rubbish to ensure that the ground is clean and smooth. In addition, the ground horizontal level can be measured by professional equipment. For concave-convex or sharp cases, it is necessary to deal with and remove them in time.
Installation Step 2: Laying Thermal Insulation Layer
You should install a moisture-proof layer generally before laying the thermal insulation layer. When laying the insulation layer, you should pay attention to the neatness of the cutting edge, which needs to be sewn up later on. In addition, the height difference of the insulation board should not exceed 5MM, and the gap should neither exceed 5MM.