How do you control the quality?

   date:2020-10-27     browse:0    comments:0    
Summary:Before moulding, 3D drawing will be confirmed firstly. After moulding, samples will be provided for approval. The mass production will be launched based on approved samples. Doing 100% inspection during production and radom inspection before packing.

Before moulding, 3D drawing will be confirmed firstly. After moulding, samples will be provided for approval. The mass production will be launched based on approved samples. Doing 100% inspection during production and radom inspection before packing.

 
Article Source: How do you control the quality?
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links