Is wellhead Constrol system tested before shipment?

   date:2020-10-27     browse:2    comments:0    
Summary:The quality review on wellhead Constrol system is completed based on regular QC evaluation, or depending upon customer requirements. Samples are chosen and inspected...
The quality review on wellhead Constrol system is completed based on regular QC evaluation, or depending upon customer requirements. Samples are chosen and inspected for flaws randomly, according to those criteria and processes. For all those, Pre-Shipment Inspection is a significant measure in the quality management procedure and is the procedure for assessing the quality of wellhead Constrol system until they're sent.
Sino Global Array image181
Through continuous innovation, Sino Global Pipeline Construction Equipment Limited has become an advanced enterprise in the field of blowout preventer factory. The safety valve is one of the main products of Sino Global Pipeline Construction Equipment. This product has the required safety. We have assessed and eliminate potential hazards by using the principles detailed in EN ISO 12100:2010. This product can stand up to the most demanding industrial environments. Sino Global Pipeline Construction Equipment is full of vitality, energy and warrior spirit. This product allows for a full 90 degrees rotation.
Sino Global Array image181
Sino Global Pipeline Construction Equipment actively shapes the current and future markets of choke valve. Welcome to visit our factory!

 
Article Source: Is wellhead Constrol system tested before shipment?
reward
 
More>Related News
0 itemsComments

Recommended Articles
Recommended News
Browse Ranking

Links