Packaging details:Wooden with plastic film
Delivery time: 20 days
Port
Shanghai port
Picture Example:
Lead Time:
Quantity(Pieces)
1 - 1
2 - 4
>4
Est. Time(days)
25
35
To be negotiated
Video Description
Related Products
GF2-100KW silent three phase water cooled diesel generator
Voltage
Frequency
(HZ)
Phase
P.F
Standby Amps
Standby Ratings (KW/KVA)
Prime Ratings
(KW/KVA)
440/254
50
3
0.8
172
105/132
100/125
415/240
50
3
0.8
182
105/132
100/125
400/230
50
3
0.8
189
105/132
100/125
380/220
50
3
0.8
199
105/132
100/125
Standby Power Rating(ESP):The standby power rating is applicable for supplying emergency power for the duration of a utility power interruption.No overload,utility parallel or negotiated outage operation capability is available at this rating.
Prime Power(PRP):Prime power is available for an unlimited number of annual hours in variable load application,in accordance with GB/T2820-97 (eqv ISO8528);A 10% overload capability is available for a period of 1 hour within a 12-hour period of operation.
ENGINE DATA
Engine Type
Weifang Huadong Engine R6105ZLD. Four stroke,Water-cooled,Direct line,Turbo type
Rated RPM (r/min)
1500rpm
Cooling System
Forced Water-cooled
Fuel Consumption (≤g/kw.h)
≤224
Compression Ratio
16:01
Bore×Stroke (mm)
105×130
Displacement (L)
6.75
Start Method
Electric Start
ALTERNATOR DATA
Alternator Data
Power Factor
0.8 Lag
Insulation Class
H
Lubricating System
Pressure,Split,Complex
exhaust Air Temperature (℃)
≤600
Altitude
≤1000m
Environment Temperature (℃)
40
Connecting Type
3 Phase and 4 Wires,"Y" type connecting
Ignite sequence
1-5-3-6-2-4
Intake Type
charge inter-cooling
Rated Speed Regulation %
≤±1%
Phase
3
Dimension & Weight
Open Type
Soundproof Type
Overall Size:2.3(m)×0.85(m)×1.5(m)
Overall Size: 2.8(m)×1.12(m)×1.68(m)
Weight :1330kg
Weight :1600kg
Contact us
How to come to Hi-earns?
♦ Line 1:TAXI
Shanghai International Airport(Pudong)
Cost(USD):85
Time:2.5 hours
♦Line 2:High speed rail
Shanghai Hongqiao railway station---Changzhou railway station
Customer Reviews total 0 items