145mm width PVC material black drift eliminator for cooling tower

  • Unit Price: Negotiable
  • Brand:

  • Origin:

    China

  • Categories:Lights & Lighting
  • Validity Period:

    Long Term

  • Published on:

    2019-10-16 19:44

Other Products
fire water storage tanks water storage tank 50000 liter assemble water tank
¥Negotiable 11Views

fire water storage tanks wat

Recommend  
200 meters fiberglass snake rodders frp duct rods 4 core cables with fiber rod
¥Negotiable 10Views

200 meters fiberglass snake

Recommend  
telescopic pole cable puller fiberglass cable push rods wire tracing tools
¥Negotiable 9Views

telescopic pole cable puller

Recommend  
12mm 150m fiberglass rod cable duct rods glassfiber wire fish cable fiber optic pullers
¥Negotiable 12Views

12mm 150m fiberglass rod cab

Recommend  
fiberglass reinforced plastic tank environmental grp sectional water tank frp assemble water tank
¥Negotiable 8Views

fiberglass reinforced plasti

Recommend  
You may like
  • Product Description
  • Company Overview

Product Information

Brand:

none

Address:

China

Min.Order:

none

Supply:

none

Valid until:

Long Term

Product Details

Overview
Quick Details
Cooling Type:
Cross Flow
Power(W):
/
Dimension(L*W*H):
120mm*1800mm
Weight:
0.52kg
Warranty:
2 Years
After-sales Service Provided:
Online support
Applicable Industries:
water treatment
Condition:
New
Material:
pvc , pp, PVC
Place of Origin:
Hebei, China
Brand Name:
Lanyu
Voltage:
/
Certification:
ISO
Name:
145mm width PVC material black drift eliminator for cooling tower
Other Nmae:
cooling tower louver
Application:
cooling tower
Thickness:
0.27mm-0.4mm
Width:
850mm,1000mm
Height:
300mm
Sample:
Free
Color:
black, grey, green, blue, white
Packing:
pallet, wooden case
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month cooling tower louver
Packaging & Delivery
Packaging Details
cooling tower louver packing by pallet, wooden case
Port
Tianjin, shanghai
Lead Time:
Quantity(Square Meters)1 - 200201 - 1000 >1000
Est. Time(days)1030To be negotiated
Product Description

    145mm width PVC material black drift eliminator for cooling tower

PVC drift eliminator/Air Inlet Louvers modules improve air flow into the cooling tower, keep out debris, eliminate water splash-out (which can cause icing, near-site water damage, and costly water and water treatment chemical loss), restrict the amount of sunlight into the cooling tower (to impede algae growth), reduce noise from the tower, and improve the tower"s appearance.

Material Info : Air intake louvers are constructed of UV-stabilized PVC. This compound has outstanding resistance to weather exposure and is nearly impervious to chemical degradation by alkali, acids, greases, fats, oils, and biological attacks. It also has an excellent fire rating due to its self-extinguishing characteristics and meets or exceeds Cooling Technology Institute Standard 136. We also have PP and PVC material which can meet the water high temperature requirement. 

Features of PVC air inlet louvers/drift eliminator for cooling tower

• Significantly block sunlight (70:1 light reduction) to reduce algae growth on interior surfaces of the cooling tower system, thus reducing the cost of algae-removal chemicals and labor.
• Reduces noise leaving the tower through the louver modules by approximately three decibels.
• Achieves very low pressure drop results.
• Pre-assembled modules available in a variety of lengths.
• Optional Assembly frames made of extruded PVC available for easy installation and access for cleaning and maintenance (mounting flanges available on 1, 2, or all 4 sides).
• Rigid, UV-stabilized PVC meets Cooling Technology Institute Standard 136.

Sheet Width(mm)
Sheet Length
Thickness
Sheet Spacing
145mm
Customized
0.2-0.4mm
25-31mm
Detailed Images

Marley Cooling Tower Drift Eliminator

Used for the Marley cooling tower fill.

BAC Cooling Tower Blade Drift Eliminator

Used for the BAC cooling tower fill.

Mist Drift Eliminator

Used for Cooling Tower

Air Inlet Louver

Used for Cooling Tower.

Packing & Delivery
                                                            Drift Eliminator / Air Inlet Louvers Packaging & Shipping
Packaging
be packed in carton or plastic film and pallet
Delivery Time
within 20 days since receiving the deposit
Transport
by sea, by air, by express delivery
Cooling Tower Fills
FAQ & Contacts

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer"s side.

Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.


If you have other questions, please feel free to contact us freely

Send your message to this supplier
* Inquiry Title
* Content
* E-mail
* Security Question

Customer Reviews total 0 items

For product pricing, customiztion, or other inquiries

Contact Supplier

Links